Walls · Structural · Approvals

Merging Restaurant Units in Dubai: The Full Approval Package

Two units into one restaurant: the wall is only the start.

Merging two restaurant units needs the landlord NOC, a structural check and design for the wall between them, the authority fit-out approval for the merged unit and Civil Defence (DCD). Because the food layout changes, the Dubai Municipality Food Safety layout approval is needed again, with an inspection before opening. Kitchen exhaust, gas and services are shown for the merged unit.

What we check first

  • Wall: Load-bearing or partition
  • Structure: Slab, beams, columns above
  • Material: Block, concrete or precast
  • Opening: Width and position
  • Records: As-built drawings or survey
  • Route: NOC, then authority

Documents you will need

  • Photos of the wall from both sides, and the ceiling above
  • Villa or unit number and community or building
  • As-built drawings, if you have them
  • Title deed and owner ID, or tenancy for shops and offices

Route

How a wall change is approved

The structural check comes first. The NOC and permit follow the area and the property type.

StepApproval routeGuides
Structural check
Our engineers
As-built drawings, or a site survey, to confirm whether the wall carries load.Is my wall load-bearing?
Design
Structural Solutions
Beam or lintel design, stamped structural calculations and drawings.—
NOC
Developer, landlord or building management
Villas in a community: developer NOC. Apartments, offices and shops: building management or landlord NOC.—
Permit
The authority for the area
DM, DDA, Trakhees or the area authority, for the structural works.Wall opening permit
Works
Your contractor
To the approved drawings, with temporary propping where needed.—
Completion
Authority and developer
Inspection and completion of the works.Wall opening sign-off

How it works

How it works

1. Send photos

The wall, the ceiling and what you want.

2. Records

As-built drawings, or a survey.

3. Structural check

Load-bearing or not, and what is above.

4. Design

Beam or lintel, stamped calculations.

5. NOC and permit

Developer, landlord or BM, then the authority.

6. Works and completion

Propping, works, inspection.

What causes problems

  • Opening the wall before the landlord NOC
  • Keeping the old food layout approval after the merge
  • No fire safety design for the larger unit

Planning a wall change?

Check the wall first

Send us three things on WhatsApp:

  1. Photos of the wall and the ceiling above
  2. Your community or building, and unit number
  3. What you want to open or remove

Our engineers check whether the wall carries load, design the beam or support and handle the NOC and the permit.

Questions

Questions

Is a new Food Safety approval needed?

Yes, the layout changes, so it needs re-approval.

Is DCD needed?

Yes, for the merged unit.

Does the landlord approve first?

Yes.

Can the kitchen move?

Yes, it is shown on the new layout for approval.

Do you handle the full package?

Yes, structure, fit-out, Food Safety and DCD.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.