TECOM Restaurant Takeover and Refit Approval
Taking over an existing restaurant in a TECOM zone needs a new approval under the new owner's name, even with no changes. A refit adds the DDA fit-out permit for the works, Dubai Municipality Food Safety approval of the new layout and Dubai Civil Defence (DCD) approval.
The previous owner's approvals do not transfer. With no changes it is a new approval under your name; with changes, the full fit-out route.
Details
Takeover scenarios
| Item | What applies |
|---|---|
| Same layout, new owner | New approval under the new owner's name |
| New kitchen or seating | Food Safety approval and DCD |
| Structural changes | DDA permit with stamped calculations |
Route
Approvals in TECOM zones
TECOM zones are regulated by DDA.
| Who | What |
|---|---|
| Landlord (building owner or TECOM) | NOC for the fit-out |
| DDA | Fit-out permit, submitted by an approved consultant |
| Dubai Municipality Food Safety | Food layout approval |
| Dubai Civil Defence (DCD) | Fire and life safety approval |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- DDA regulates TECOM zones and issues the fit-out permit.
- DM Food Safety approves food layouts in TECOM zones too.
- DCD approves every restaurant.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Currently approved food layout (for an existing restaurant)
- Photos of the unit
- Your idea: a sketch of the layout or change
How it works
How we handle it
1. Unit check
Lease, zone and unit drawings.
2. Landlord
NOC for the fit-out.
3. Drawings
Layout, kitchen and fire safety.
4. DDA
Fit-out permit.
5. Food Safety and DCD
Approvals.
6. Inspection
Before opening.
Already done
Works already done without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions owners ask
Do approvals transfer when I take over a restaurant?
No. A takeover needs a new approval under the new owner's name, even with no changes.
Do I need DDA for a refit?
Yes, where the refit includes fit-out or structural works.
Who can help?
We review the existing approvals and handle the new ones. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
