TECOM Restaurant Outdoor Seating Approval
Outdoor seating outside a restaurant in a TECOM zone needs approval from whoever controls that space, usually the landlord or the master developer for the zone. Structures need a DDA permit with stamped calculations, and the seats need Food Safety re-approval and DCD approval.
The approver for the space depends on who controls it. Seats change the food layout, so Food Safety re-approves it.
Details
Where your seats go
| Item | What applies |
|---|---|
| Forecourt of your building | Building landlord |
| Shared plaza or walkway | Whoever controls it, usually the master developer |
| Shade or pergola | Stamped calculations and DDA |
Route
Approvals in TECOM zones
TECOM zones are regulated by DDA.
| Who | What |
|---|---|
| Landlord (building owner or TECOM) | NOC for the fit-out |
| DDA | Fit-out permit, submitted by an approved consultant |
| Dubai Municipality Food Safety | Food layout approval |
| Dubai Civil Defence (DCD) | Fire and life safety approval |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- DDA regulates TECOM zones and issues the fit-out permit.
- DM Food Safety approves food layouts in TECOM zones too.
- DCD approves every restaurant.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Currently approved food layout (for an existing restaurant)
- Photos of the unit
- Your idea: a sketch of the layout or change
How it works
How we handle it
1. Unit check
Lease, zone and unit drawings.
2. Landlord
NOC for the fit-out.
3. Drawings
Layout, kitchen and fire safety.
4. DDA
Fit-out permit.
5. Food Safety and DCD
Approvals.
6. Inspection
Before opening.
Already done
Works already done without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions owners ask
Who approves outdoor seating in Dubai Media City?
Whoever controls the space: the landlord or the master developer; then DDA for structures, plus Food Safety and DCD.
Do the outdoor seats need Food Safety approval?
Yes. They change the food layout.
Who can help?
We find the approver and handle the rest. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides

