TECOM Café Fit-Out Approval
A café fit-out in a TECOM zone needs the landlord NOC, a DDA fit-out permit, Dubai Municipality Food Safety approval of the café layout and Dubai Civil Defence (DCD) approval, even when the kitchen is small.
Cafés go through the same approvals as restaurants. A smaller kitchen changes the drawings, not the route.
Details
Café types
| Item | What applies |
|---|---|
| Coffee bar, no cooking | Food Safety layout and DCD still apply |
| Café with a hot kitchen | Exhaust and suppression for DCD |
| Kiosk in a lobby | Landlord approval; see kiosks |
Route
Approvals in TECOM zones
TECOM zones are regulated by DDA.
| Who | What |
|---|---|
| Landlord (building owner or TECOM) | NOC for the fit-out |
| DDA | Fit-out permit, submitted by an approved consultant |
| Dubai Municipality Food Safety | Food layout approval |
| Dubai Civil Defence (DCD) | Fire and life safety approval |
Official sites: Dubai Municipality | Dubai Civil Defence | DDA
What you need to know
- DDA regulates TECOM zones and issues the fit-out permit.
- DM Food Safety approves food layouts in TECOM zones too.
- DCD approves every restaurant.
Documents you will need
- Trade licence
- Tenancy contract or Ejari
- Currently approved food layout (for an existing restaurant)
- Photos of the unit
- Your idea: a sketch of the layout or change
How it works
How we handle it
1. Unit check
Lease, zone and unit drawings.
2. Landlord
NOC for the fit-out.
3. Drawings
Layout, kitchen and fire safety.
4. DDA
Fit-out permit.
5. Food Safety and DCD
Approvals.
6. Inspection
Before opening.
Already done
Works already done without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Questions owners ask
Does a small café need DCD approval?
Yes. Every food outlet proposal needs DCD approval.
Does a coffee bar need Food Safety approval?
Yes. Any food or drink preparation layout needs Dubai Municipality Food Safety approval.
Who can help?
We prepare the café drawings and handle the approvals. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
