Nakheel · Trakhees

Nakheel Painting NOC

In Nakheel communities such as Palm Jumeirah, Jumeirah Islands, Jumeirah Park and Al Furjan, repainting the outside of a villa needs a painting NOC from Nakheel, then the permit from Trakhees. Nakheel usually requires the existing colour and provides the colour code.

What Nakheel Reviews

The colour against the approved palette or existing colour code, the areas to be painted and the contractor details.

Match Existing ColourDeveloper colour code
Developer NOCBefore painting
Authority PermitDM, DDA or Trakhees

What you need to know

  • After the NOC: The authority permit follows — Trakhees. Then the contractor paints to the approved colour.
  • Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
  • Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
  • VSR: Unapproved works show up in the Villa Status Report (VSR) and need fixing before a sale.

Documents you will need

  • Title deed and owner Emirates ID or passport
  • Villa plans from Nakheel, or as-built drawings
  • Proposed drawings
  • Stamped structural calculations for structural works
  • Photos of the area

At a glance

Nakheel Painting NOC at a glance

Who does what, step by step.

WhoApproval routeGuides
You or your consultant
Step 1
Photos of the elevations and the existing colour code from the developer.—
Nakheel, master developer
Step 2
Painting NOC — usually requires matching the existing colour, using the code the developer provides.—
Authority — Trakhees
Step 3
Permit for the external painting works.—
Contractor
Step 4
Paints to the approved colour; inspection where required.—

How it works

How the Painting Approval Works

Photos & Existing Colour Code

Developer Painting NOC

Authority Permit (DM, DDA or Trakhees)

Contractor Mobilization

Painting Works

Inspection & Sign-Off

Who does what

Three parties, one route

🏘️

Nakheel

Master developer. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

Painting Works We Help With

  • Villa Exterior
  • Townhouse Exterior
  • Boundary Wall
  • Gates & Doors
  • Window Frames
  • Repaint After Extension
  • Why Owners Use Structural Solutions

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

Does Nakheel require a painting NOC?

Yes for external painting, usually matching the existing colour code.

Do I need a NOC to paint the outside of my villa?

Yes in master-developer communities — the developer NOC, then the permit from DM, DDA or Trakhees.

Do I have to keep the same colour?

Developers usually ask you to match the existing colour and provide the colour code.

Do I need approval to paint inside my villa?

No — interior painting of a villa does not need a NOC (Wasl properties have their own painting NOC).

Do scaffolding or gondolas need approval?

Yes — from DM, DDA or Trakhees, plus RTA when they are on the road.

Related guides

Keep reading