Who Can Submit an RTA Access Permit?

RTA access applications are normally submitted by a registered consultant on behalf of the plot owner, with the owner’s documents and the developer NOC where required.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What the Owner Provides

Title deed or affection plan, owner ID, and authorisation for the consultant. The consultant provides the drawings and handles the submission.

How We Get Your Plot Access Approved

01

Site Survey & Plot Limits (DLTM)

02

RTA Access Design Study

03

Developer Plot Access NOC

04

RTA Construction NOC

05

RTA Sidewalk Modification Permit

06

Works, Handover & Deposit Refund

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What We Handle

Site survey, DLTM drawings, RTA access design study, developer NOC, construction NOC and sidewalk permit.

Projects We Handle

New Driveway

Second Driveway

Kerb Cut

Interlock

Gate Relocation

Access Widening

Who Can Submit an RTA Access Permit? at a Glance

StepWhoWhat happens
1Structural engineerSurveys the road frontage and prepares drawings in DLTM coordinates for RTA.
2Master developer (where applicable)NOC for works in the community.
3RTAReviews the drawings and issues the NOC or permit.
4Service authoritiesDEWA and telecom clearances where services are affected.
5RTAInspection and reinstatement check after works.

Documents Required

  • Affection plan / site plan
  • Owner or company documents
  • Survey-based drawings in DLTM coordinates
  • Developer NOC (in master-developer communities)
  • Existing services information, where available

Key Technical Rules

  • Approval before road works: any work in the road reserve needs RTA approval first.
  • DLTM drawings: RTA reviews drawings in DLTM coordinates.
  • Utility clearances: DEWA and telecom services are checked where they run under the works.
  • Work zone safety: works follow RTA work zone traffic management rules.
  • Reinstatement: the road, kerb and footpath are reinstated and inspected.
RTA parking and access approval in Dubai — Structural Solutions

RTA Approval

Before road works

DLTM Drawings

Survey-based

Utility Clearances

Where needed

Why Owners Choose Structural Solutions

Full Access Approval Chain

RTA access design study, developer plot access NOC, RTA construction NOC and sidewalk modification permit — coordinated in one scope.

DLTM Drawings From Site Survey

We survey the site and prepare AutoCAD drawings in DLTM coordinates plus PDF — the format Nakheel, RTA and other developers ask for.

Fewer Returned Submissions

Plot limit, access, kerb, interlock and the tie-in to the existing carriageway are shown clearly, so reviewers have what they need.

Get Your Plot Access Approved

Send us your affection plan and what you want to build at the plot entrance — we will survey, prepare the DLTM drawings and handle the RTA and developer approvals.

Who Can Submit an RTA Access Permit? — FAQs

Can I apply myself?

Applications are normally made through a consultant; we handle them for you.

What do you need from me?

Title deed or affection plan, ID and an authorisation.

Do you prepare the access drawings?

Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.

Can works start before all approvals?

No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.

Who handles the submissions?

We prepare the drawings and handle the RTA and developer submissions as your consultant.