We show the existing services on the survey-based DLTM drawings and coordinate the service clearances needed alongside the RTA approvals.
DEWA & Telecom NOCs for Access Works
Kerb cuts, driveways and interlock at the road edge often sit over DEWA cables, water lines and telecom ducts. Service NOCs and clearances confirm the works will not damage them.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Why Utilities Matter
Cables and pipes run under footpaths and verges. Cutting the kerb or excavating for the driveway without checking them risks damage and liability.
How We Get Your Plot Access Approved
01
Site Survey & Plot Limits (DLTM)
02
RTA Access Design Study
03
Developer Plot Access NOC
04
RTA Construction NOC
05
RTA Sidewalk Modification Permit
06
Works, Handover & Deposit Refund
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
How We Handle It
Projects We Handle
DEWA Cables
Water Lines
Telecom Ducts
Street Lighting
Irrigation Lines
Drainage
DEWA & Telecom NOCs for Access Works at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Reviews the villa, prepares the drawings and stamped structural calculations for the change. |
| 2 | Master developer (where the community has one) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — Dubai Municipality, DDA or Trakhees — depending on the community | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Existing approved drawings — or an as-built survey if you have none
- Proposed drawings and stamped structural calculations — prepared by us
Key Technical Rules
- Structural check first: any change to walls, slabs or openings is checked by an engineer before design.
- Community guidelines: the master developer's design rules govern facades, colours, heights and materials.
- Added area counts as GFA: any increase in built-up area is reviewed as additional GFA.
- Approvals before work: work starts only after the NOC and the building permit are issued.
- Sign-off at the end: completion drawings and an inspection close the file.
Developer NOC
Community guidelines
Building Permit
Before work starts
Stamped Drawings
By our engineers
Why Owners Choose Structural Solutions
Full Access Approval Chain
RTA access design study, developer plot access NOC, RTA construction NOC and sidewalk modification permit — coordinated in one scope.
DLTM Drawings From Site Survey
We survey the site and prepare AutoCAD drawings in DLTM coordinates plus PDF — the format Nakheel, RTA and other developers ask for.
Fewer Returned Submissions
Plot limit, access, kerb, interlock and the tie-in to the existing carriageway are shown clearly, so reviewers have what they need.
Get Your Plot Access Approved
Send us your affection plan and what you want to build at the plot entrance — we will survey, prepare the DLTM drawings and handle the RTA and developer approvals.
DEWA & Telecom NOCs for Access Works — FAQs
Do I need utility NOCs for a kerb cut?
Where services run under the work area, clearances are needed before excavation.
Who is liable for damaged services?
The applicant and contractor carrying out the works.
Do you prepare the access drawings?
Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.
Can works start before all approvals?
No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.
Who handles the submissions?
We prepare the drawings and handle the RTA and developer submissions as your consultant.