Structural engineering is the part most sign makers and PRO agencies cannot provide. Having it in-house means fewer rejections and safer signs.
Signage Approval Partner for Fit-Out Companies
Fit-out companies bring us in to run the signage approvals alongside the fit-out, so signs are approved by opening day.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
How We Work With You
Send us the sign design and site details; we return stamped drawings and calculations and, if you want, manage the submissions under your brand or directly with your client.
How We Get Your Signage Approved
01
Sign Design, Size & Location Reviewed
02
Landlord, Mall or Developer NOC
03
Structural Check Where Needed
04
Engineer-Stamped Drawings & Calculations
05
Authority Signage Permit
06
Installation & Inspection
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Why Partner With Engineers
Projects We Handle
Rooftop Signs
Pylons & Totems
Billboards
Facade Signs
LED Screens
Mall Signage
Signage Approval Partner for Fit-Out Companies at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Prepares the sign drawings and, for larger signs, the stamped structural calculations. |
| 2 | Landlord, mall or master developer | Issues the NOC for the works. |
| 3 | Authority — Dubai Municipality, DDA or Trakhees — depending on the community | Reviews the drawings and issues the permit. |
| 4 | Landlord and authority | Completion inspection. |
Documents Required
- Trade licence
- Tenancy contract or Ejari
- Landlord, mall or developer NOC
- Sign design with size, materials and position
- Photos of the facade or location
Key Technical Rules
- NOC first: the landlord, mall or developer approves the sign before the authority permit.
- Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
- Size and position rules: set by the building and the authority for the area.
- Electrical safety: illuminated signs need safe electrical details.
- Permit before installation: signs go up only after approval.
Landlord NOC
First approval
Wind & Fixings
Stamped calculations
Signage Permit
Before installation
Why Businesses and Sign Companies Choose Structural Solutions
Structural Engineering In-House
Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.
Engineer-Stamped Drawings
Drawings and calculations stamped for landlords, malls, developers and authorities.
Full Approval Route
From the landlord, mall or developer NOC through to the authority signage permit.
Get Your Signage Approved
Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.
Signage Approval Partner for Fit-Out Companies — FAQs
Do you work with sign companies?
Yes — on calculations, stamped drawings and approvals.
Can you stamp our drawings?
Yes, after engineer review.
Can I install the sign before approval?
No — install only after the landlord or mall approval and the signage permit are issued.
Do you prepare the sign drawings?
Yes — elevations, materials and fixing details, stamped where required.
Why choose an engineering consultancy for signage?
Because larger signs need structural engineering — we provide calculations, stamped drawings and the approvals in one place.