Consultant Stamp for Signage Drawings Dubai

Malls, landlords and authorities often require signage drawings stamped by a registered consultant. We review, correct where needed and stamp your sign drawings.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

How We Work With You

Send us the sign design and site details; we return stamped drawings and calculations and, if you want, manage the submissions under your brand or directly with your client.

How We Get Your Signage Approved

01

Sign Design, Size & Location Reviewed

02

Landlord, Mall or Developer NOC

03

Structural Check Where Needed

04

Engineer-Stamped Drawings & Calculations

05

Authority Signage Permit

06

Installation & Inspection

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Why Partner With Engineers

Structural engineering is the part most sign makers and PRO agencies cannot provide. Having it in-house means fewer rejections and safer signs.

Projects We Handle

Rooftop Signs

Pylons & Totems

Billboards

Facade Signs

LED Screens

Mall Signage

Consultant Stamp for Signage Drawings Dubai at a Glance

StepWhoWhat happens
1Structural engineerPrepares the sign drawings and, for larger signs, the stamped structural calculations.
2Landlord, mall or master developerIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, mall or developer NOC
  • Sign design with size, materials and position
  • Photos of the facade or location

Key Technical Rules

  • NOC first: the landlord, mall or developer approves the sign before the authority permit.
  • Structural calculations: rooftop, pylon and large facade signs need stamped calculations for wind and fixings.
  • Size and position rules: set by the building and the authority for the area.
  • Electrical safety: illuminated signs need safe electrical details.
  • Permit before installation: signs go up only after approval.
As-built drawings and measured survey in Dubai — Structural Solutions

Landlord NOC

First approval

Wind & Fixings

Stamped calculations

Signage Permit

Before installation

Why Businesses and Sign Companies Choose Structural Solutions

Structural Engineering In-House

Wind load, fixing and frame calculations by our engineers — the part most sign makers and PRO agencies cannot provide.

Engineer-Stamped Drawings

Drawings and calculations stamped for landlords, malls, developers and authorities.

Full Approval Route

From the landlord, mall or developer NOC through to the authority signage permit.

Get Your Signage Approved

Send us your sign design, size and location — we will confirm the approvals, prepare stamped drawings and calculations, and handle the submissions.

Consultant Stamp for Signage Drawings Dubai — FAQs

Do you work with sign companies?

Yes — on calculations, stamped drawings and approvals.

Can you stamp our drawings?

Yes, after engineer review.

Can I install the sign before approval?

No — install only after the landlord or mall approval and the signage permit are issued.

Do you prepare the sign drawings?

Yes — elevations, materials and fixing details, stamped where required.

Can you work with my sign company?

Yes — we provide structural calculations, stamped drawings and approval support for sign makers.