DAMAC Riverside · DAMAC · DDA

Is DAMAC Riverside Under DM, DDA or Trakhees?

Who issues permits in DAMAC Riverside.

Building permits for villa and townhouse works in DAMAC Riverside come from the Dubai Development Authority (DDA), after the DAMAC NOC. Dubai Municipality and Trakhees do not issue permits for DAMAC Riverside. We prepare the drawings and handle both steps.

What we check first

  • Plot: Setbacks
  • Home: Villa or townhouse
  • Structure: Walls, slabs, foundations
  • Area: Added floor area
  • Look: DAMAC guidelines
  • Route: DAMAC, then DDA

Documents you will need

  • Villa or townhouse number in DAMAC Riverside
  • Title deed or sale contract and owner ID
  • Photos of the home and the area
  • Plans from your handover documents, if you have them

Route

The approval route in DAMAC Riverside

DAMAC first, then DDA. Villas and townhouses follow the same route.

StepApproval routeGuides
Early check
Our engineers
Your idea, photos and plot; plans from your handover documents, or a survey.—
Drawings
Structural Solutions
Drawings and stamped structural calculations.Structural calculations
DAMAC NOC
DAMAC
Against the community guidelines.How to apply
DDA permit
Dubai Development Authority (DDA)
For structural works and added area.DAMAC Riverside DDA permit
Works
Your contractor
To the approved drawings.—
Completion
DAMAC and DDA
Inspections, DAMAC clearance and the DDA completion certificate.Sign-off

How it works

How it works

1. Send us the idea

Villa number, photos and what you want.

2. Plans

Handover plans, or a survey.

3. Early check

Guidelines, plot and structure.

4. Drawings

Drawings and calculations.

5. DAMAC NOC

Against DAMAC’s guidelines.

6. DDA permit

Then works and completion.

Home in DAMAC Riverside?

Check your idea first

Send us three things on WhatsApp:

  1. Villa or townhouse number
  2. Photos of the area
  3. What you want to do

We check DAMAC’s guidelines and the structure, then handle the DAMAC NOC and the DDA permit.

Questions

Questions

Is DAMAC Riverside under Dubai Municipality?

No, DDA issues the permits.

Who approves first?

DAMAC.

Is it the same for villas and townhouses?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading