Engineers · Registration

What Is a DM-Registered Structural Engineer?

Dubai Municipality submissions are made by registered engineering consultants.

Dubai Municipality registers engineering consultancies and their engineers, and building permit submissions to Dubai Municipality are made through a registered consultant. That is why an owner cannot submit structural drawings alone. Structural Solutions submits as your consultant: our engineers prepare and stamp the drawings and calculations and handle the permit. DDA and Trakhees have their own registrations for their areas.

What Is a DM-Registered Structural Engineer?

Official sources: Dubai Municipality · DDA

What we check

  • Consultant: Registered with the authority
  • Drawings: Prepared and stamped
  • Submission: Through the consultant
  • Area: DM, DDA or Trakhees
  • Comments: Answered
  • Completion: Closed

Documents you will need

  • Title deed or tenancy contract
  • Owner or tenant ID
  • Existing drawings, if available
  • Photos and a short description

Route

How a registered consultant submits

The general route. We confirm it for your project.

StepApproval routeGuides
Your project
You
What you want to build or change.—
Consultant
Structural Solutions
Registered consultant for the submission.—
Drawings
Our engineers
Drawings and stamped calculations.—
Submission
DM, DDA or Trakhees
By us, through the authority system.—
Comments
Our engineers
Until approval.—
Completion
Authority
Inspection and certificate.—

How it works

How we work

1. Send us the details

Property, area and what you need.

2. Check

Route and documents confirmed.

3. Site

Visit or survey if needed.

4. Design

Drawings and calculations by our engineers.

5. Submission

By us.

6. Follow-up

Comments until approval.

What causes problems

  • Unregistered submissions
  • Drawings without stamped calculations
  • Wrong authority format

Need help with this?

Get your route confirmed

Send us three things on WhatsApp:

  1. Property and area
  2. What you want to do
  3. Any drawings you have

Our engineers confirm the route, prepare the drawings and handle the submissions.

Questions

Questions

Can I submit structural drawings myself?

Permit submissions go through a registered consultant; we submit for you.

Is it the same for DDA and Trakhees?

They have their own registrations for their areas.

Who stamps the calculations?

Our engineers.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading