Permits · Record check

Building Permit Record Check in Dubai

Before you buy, take over a project or restart works: what does the authority have on file?

A building permit record check confirms what the authority has on file for a property or project: whether a permit is active, expired or closed, the contractor and consultant on record, the approved scope and the drawings. It is useful before buying, before taking over a project, when a contractor leaves, or when works restart. As your consultant we request the records and tell you what they mean.

Building Permit Record Check in Dubai

Official sources: Dubai Municipality · DDA

What we check

  • Status: Active, expired or closed
  • Contractor: On record
  • Consultant: On record
  • Scope: Approved works
  • Drawings: On file
  • Completion: Certificate or not

Documents you will need

  • Title deed or tenancy contract
  • Owner or tenant ID
  • Existing drawings, if available
  • Photos and a short description

Route

How a record check works

The general route. We confirm it for your project.

StepApproval routeGuides
Permit number or plot
You
Whatever you have.—
Record request
Structural Solutions
From the authority, as your consultant.—
Review
Our engineers
Status, contractor, scope and drawings.—
Site comparison
Our engineers
If needed: built against approved.—
Findings
Structural Solutions
What it means and next steps.—
Next step
You
Renew, change contractor, as-built route or proceed.—

How it works

How we work

1. Send us the details

Property, area and what you need.

2. Check

Route and documents confirmed.

3. Site

Visit or survey if needed.

4. Design

Drawings and calculations by our engineers.

5. Submission

By us.

6. Follow-up

Comments until approval.

Related questions

What causes problems

  • Buying without checking
  • Old contractor still on record
  • Works beyond the approved scope

Need help with this?

Get your route confirmed

Send us three things on WhatsApp:

  1. Property and area
  2. What you want to do
  3. Any drawings you have

Our engineers confirm the route, prepare the drawings and handle the submissions.

Questions

Questions

Can I check a permit before buying?

Yes. We request the records as your consultant.

What if the permit expired?

It can usually be renewed or revalidated; it depends on the case.

What if works differ from the permit?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading