Nakheel · Jebel Ali Village

Jebel Ali Village Structural Calculations

Get stamped structural calculations for your Jebel Ali Village project — confirming your design meets Trakhees' safety requirements.

What Are Structural Calculations and When Are They Needed?

Structural calculations demonstrate, with engineering analysis, that your planned changes in Jebel Ali Village — new beams, load-bearing wall removal, extensions, or additional floors — can safely carry the loads involved. Trakhees requires these calculations alongside your drawings for any project affecting the structure. We prepare and stamp calculations that meet Trakhees' technical review standards.

Loads to CodeDead, live and wind

What you need to know

  • Trakhees Approvals We Handle in Jebel Ali Village: Types of structural calculations we prepare for Jebel Ali Village projects.
  • Ready to Start Your Jebel Ali Village Approval?: Speak with our structural engineering team today and get a clear scope, timeline, and fixed quote for your project.
  • Registered engineer: calculations are stamped by an authority-registered consultant.
  • Loads to code: dead, live and wind loads to the applicable codes.
  • Connections designed: fixings, base plates and connections are included.
  • Existing structure checked: where new loads are added to an existing building.

Documents you will need

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Architectural or shop drawings of the element
  • Existing structural drawings, if available

At a glance

Jebel Ali Village Structural Calculations at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Prepares the structural design and calculations and stamps them as an authority-registered consultant.—
Master developer (where the community has one)
Step 2
Issues the community NOC against its design guidelines.—
Building authority — Trakhees
Step 3
Building permit; work starts only after it is issued.—
Developer and authority
Step 4
Completion inspection and sign-off.—

How it works

How We Handle Your Jebel Ali Village Approval

We inspect your villa and confirm exactly what documentation and approvals your work needs before anything is submitted.

Our engineers prepare structural drawings and calculations in Trakhees format, stamped and ready for submission.

We submit your application and drawings to Trakhees on your behalf and track it through review.

If Trakhees raises a comment or requests a revision, we handle it directly so your approval doesn't stall.

Once approved, you receive your NOC or permit ready to hand to your contractor or building management.

We stay available through construction for inspections, as-built drawings, or final sign-off if your approval requires it.

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Jebel Ali Village. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

Approval Types

  • Beam & Slab Load Calculations
  • Foundation Load Calculations
  • Wall Removal Load Path Calculations
  • Extension Structural Calculations
  • Second Floor Addition Calculations
  • Retaining Wall Calculations

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

Do I need calculations for every project, or just major ones?

Any structural change — even wall removal or a modest extension — needs supporting calculations. Purely cosmetic work does not.

Who reviews the calculations at Trakhees?

Trakhees' technical review team checks the calculations against the submitted drawings to confirm the design is structurally sound.

What happens if my calculations don't meet Trakhees' standards?

Trakhees will raise a technical query requiring revision — we handle these directly to keep your approval moving.

Do calculations need to be updated if my design changes mid-project?

Yes, any design change should be reflected in updated calculations before resubmission.

Related guides

Keep reading