A JAFZA Mezzanine Floor Permit authorizes the construction of a new mezzanine level within a warehouse or industrial unit. Documentation must be prepared by a UAE-licensed engineer and submitted in Trakhees CED's required format before works begin, or as part of a regularisation submission if works are already underway.
JAFZA Mezzanine Floor Permit
A JAFZA Mezzanine Floor Permit authorizes the construction of a new mezzanine level within a warehouse or industrial unit. Structural Solutions prepares the documentation and manages the complete Trakhees CED submission for JAFZA and Nakheel-community warehouse and industrial projects.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
What is JAFZA Mezzanine Floor Permit?
A JAFZA Mezzanine Floor Permit authorizes the construction of a new mezzanine level within a warehouse or industrial unit. Trakhees CED — the Community Engineering & Environmental Department of Dubai's Ports, Customs & Free Zone Corporation — regulates JAFZA and several Nakheel-developed communities, using its own drawing format and documentation standards distinct from DDA and Dubai Municipality.
JAFZA Mezzanine Floor Permit Process
01
Scope Assessment & Documentation Review
02
Structural Drawings Prepared to Trakhees CED Format
03
Trakhees CED Portal Submission
04
Trakhees CED Technical Review
05
Fee Payment & Issuance
06
Works Cleared / Approval Confirmed
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
When Do You Need JAFZA Mezzanine Floor Permit?
What Trakhees CED Reviews
Structural Load & Safety Compliance
Drawing Format & Documentation Standards
Site & Boundary Compliance
Registered Engineer Verification
Fee Assessment
Inspection & Sign-Off Requirements
Simple Approval Process
How Our Approval Process Works
We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.
Quick Review
We review drawings and project requirements fast.
Plan Design
Our team prepares compliant
drawings and files.
Easy Submit
We submit documents to
Dubai authorities safely.
Final Permit
Receive approvals and
permits without delays.
Proven track record
Across JAFZA & Trakhees communities
Established firm
Years of experience
Highly rated
By our clients
Why JAFZA Clients Choose Structural Solutions
Trakhees CED Format Expertise
We prepare drawings and documentation to the exact Trakhees CED format and standard, avoiding rejection on first submission.
Registered Engineer Sign-Off
Our documentation is prepared and signed by UAE-licensed engineers registered to submit to Trakhees CED.
End-to-End Submission Management
We manage the complete Trakhees CED portal submission, technical review, and issuance as one engagement.
We Handle JAFZA Mezzanine Floor Permit Start to Finish
Structural Solutions manages the complete mezzanine floor permit process for JAFZA and Trakhees-regulated warehouse projects, from documentation through portal submission to issuance.
JAFZA Mezzanine Floor Permit — Frequently Asked Questions
Who issues approval for mezzanine floor permit?
The Community Engineering & Environmental Department (CED) of Trakhees, which regulates JAFZA and Nakheel-developed communities.
How long does mezzanine floor permit take?
Timelines vary by project scope and complexity. Structural Solutions can confirm an estimated timeline once we've reviewed your specific project.
Does Trakhees CED use different standards than DDA or DM?
Yes. Trakhees CED has its own drawing format and documentation requirements, distinct from DDA and Dubai Municipality standards.
What happens without approval for mezzanine floor permit?
Works carried out without the required approval are considered unauthorized and may be issued a stop-work order or penalty, with regularisation required before sign-off.
Can Structural Solutions handle the full process?
Yes. We prepare drawings and documentation, manage the CED portal submission, and carry the project through to issuance.
Trakhees & JAFZA Approval Guides
Get Started With JAFZA Mezzanine Floor Permit Today!
- approvals
- Calculations
- Engineering
- Guides
- Pergolas
- steel & Aluminum


