Villa sign-off · Dubai

Second Floor Addition Sign-Off Dubai

Finish the second floor addition as approved, prepare as-built drawings and the owner letter, pass the developer and authority inspections, and receive the completion certificate.

A second floor addition sign-off in Dubai means the final inspection and the completion certificate for the approved structural and architectural works. As-built drawings, an engineer check and an owner letter are prepared, then the developer and the authority inspect the works against the approved drawings.

Final inspectionDeveloper and authority
Owner letterCompletion pack
Completion certificatePermit closed

Works finished?

Request your completion certificate online. Tell us what was done, upload your documents, and we initiate the sign-off with the relevant developer and authority on your behalf.

Request sign-off online →

What the inspectors check

  • Structure as approved: Our engineer checks the structural works against the approved drawings.
  • Built as approved: Any change from the approved drawings must be approved or corrected before sign-off.
  • As-built drawings: Drawings of the works as built, matching the approved drawings, are needed for the final inspection and the completion certificate.
  • Owner letter: A signed owner letter is required for the completion certificate.
  • Deposit: Where the developer took a refundable deposit, it is returned after clearance.

Documents you will need

  • Approved NOC and permit drawings
  • Photos of the finished works
  • Title deed and owner ID
  • Contractor details, if available
  • Any inspection comments received

How it works

How second floor addition sign-off works

01

Works finished as approved

02

As-built structural and architectural drawings

03

Structural engineer check

04

Developer final inspection

05

Authority final inspection

06

Completion certificate

Who does what

Who is involved in second floor addition sign-off

📐

Structural Solutions

Completion drawings, structural check and the owner letter pack. We request and attend the inspections.

🏘️

Developer inspector

Final inspection against the approved NOC drawings, where the community has a developer. Returns any refundable deposit after clearance.

🏛️

Authority inspector

DM, DDA or Trakhees, depending on the community, carries out the final inspection and issues the completion certificate. The order with the developer can vary.

What holds up sign-off

  • Works differ from the approved drawings
  • No as-built drawings
  • Owner letter missing
  • Inspection comments still open

Questions

Frequently asked questions

What happens if I skip the second floor sign-off?

The permit stays open, which can delay a sale. Buyers and banks may ask for it to be closed.

Which authority closes the permit?

It depends on the community: DDA for Dubai Hills and Arabian Ranches, DM for The Meadows, The Springs and The Lakes, and Trakhees for Palm Jumeirah and Jumeirah Park.

Do I need as-built drawings for second floor sign-off?

Yes. As-built drawings matching the approved NOC and permit drawings are needed, with a signed owner letter.

Can you close an older second floor permit?

Yes. Send us the NOC and permit details and we will review what is needed to close it.

What do you need from me to get started?

Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works. We confirm the approvals needed and prepare the submission.