العربيةDAMAC · NOC and approvals

DAMAC NOC and approvals in Dubai: DAMAC Hills, DAMAC Hills 2 and Lagoons

Villa works in DAMAC communities need the DAMAC NOC first, then the Dubai Development Authority (DDA) permit. We prepare the drawings and stamped calculations, apply to DAMAC and submit to DDA for you.

The short answer

In DAMAC Hills, DAMAC Hills 2 and DAMAC Lagoons, extensions, pergolas, pools, boundary walls, facade and structural changes need a DAMAC NOC, applied for by email with drawings and stamped calculations. After the NOC, an approved consultant submits to the Dubai Development Authority (DDA) for the building permit. After the works, DDA and DAMAC inspect and the works are signed off.

FirstDAMAC NOC by email
ThenDDA permit
Submitted byApproved consultant
AfterInspection and sign-off

DAMAC approvals: what you need to know

  • DAMAC NOC: Applied for by email with drawings and calculations
  • DDA permit: Submitted by an approved consultant
  • Calculations: Stamped, for any structural work
  • Tenants: Need the landlord's written consent
  • Extension charge: Based on added floor area
  • Completion: Inspection and sign-off

Documents you will need

  • Title deed and owner ID
  • Affection plan
  • Existing drawings (we obtain them or survey)
  • Proposed drawings and stamped calculations (we prepare these)
  • Landlord consent, if a tenant applies

By community

DAMAC communities and their route

We confirm the route for your plot.

CommunityApproval routeGuides
DAMAC Hills
DAMAC → DDA
DAMAC NOC by email, then DDA.DAMAC Hills
Modifications
DAMAC Hills 2
DAMAC → DDA
DAMAC NOC by email, then DDA.Extensions
Modifications
DAMAC Lagoons
DAMAC → DDA
DAMAC NOC by email, then DDA.DAMAC Lagoons

How it works

6 steps to your DAMAC approval

1. Your idea

Community, villa and scope.

2. Drawings

Existing and proposed drawings, stamped calculations.

3. DAMAC NOC

Applied for by email.

4. DDA permit

Submitted by an approved consultant.

5. Works

Built to the approved drawings.

6. Sign-off

DDA and DAMAC inspection.

Common reasons for delays

  • Missing stamped calculations
  • Drawings that do not match the villa as built
  • Tenant applying without landlord consent
  • Works started before the DDA permit

Need a DAMAC NOC?

Get your DAMAC route today

Send us three things on WhatsApp:

  1. Your community and villa number
  2. Photos of the area
  3. What you want to build or change

We prepare the drawings, apply to DAMAC and submit to DDA as your consultant.

Questions

DAMAC NOC questions

How do I get a DAMAC NOC?

We prepare the drawings and stamped calculations and apply to DAMAC for the NOC by email. After the NOC, we submit to the Dubai Development Authority (DDA) for the permit.

Which authority approves works in DAMAC Hills?

The Dubai Development Authority (DDA), after the DAMAC NOC.

Is DAMAC Hills 2 also under DDA?

Yes, DAMAC NOC first, then DDA.

What about DAMAC Lagoons?

DAMAC NOC, then DDA.

Which works need a DAMAC NOC?

Extensions, pergolas, pools, boundary walls, facade changes, rooftop structures and structural changes such as removing a load-bearing wall.

Do I need a NOC for painting or flooring inside?

Internal finishes that do not touch the structure or the exterior usually do not.

Do I need structural calculations?

Yes, for extensions, pergolas, wall removals and any structural work. We prepare and stamp them.

Can a tenant apply for a DAMAC NOC?

With the landlord's written consent.

Does DAMAC charge for extensions?

DAMAC charges on added floor area; we explain how it works for your villa.

What happens after the works?

DDA and DAMAC inspect, then the completion and sign-off.

What if I built without a NOC?

We survey the works and help regularise them, or advise what must be removed.

Can you handle the whole process?

Yes: drawings, calculations, the DAMAC NOC, the DDA permit and completion.