DAMAC NOC and approvals in Dubai: DAMAC Hills, DAMAC Hills 2 and Lagoons
Villa works in DAMAC communities need the DAMAC NOC first, then the Dubai Development Authority (DDA) permit. We prepare the drawings and stamped calculations, apply to DAMAC and submit to DDA for you.
The short answer
In DAMAC Hills, DAMAC Hills 2 and DAMAC Lagoons, extensions, pergolas, pools, boundary walls, facade and structural changes need a DAMAC NOC, applied for by email with drawings and stamped calculations. After the NOC, an approved consultant submits to the Dubai Development Authority (DDA) for the building permit. After the works, DDA and DAMAC inspect and the works are signed off.

Official sources: DAMAC Properties · Dubai Development Authority
DAMAC approvals: what you need to know
- DAMAC NOC: Applied for by email with drawings and calculations
- DDA permit: Submitted by an approved consultant
- Calculations: Stamped, for any structural work
- Tenants: Need the landlord's written consent
- Extension charge: Based on added floor area
- Completion: Inspection and sign-off
Documents you will need
- Title deed and owner ID
- Affection plan
- Existing drawings (we obtain them or survey)
- Proposed drawings and stamped calculations (we prepare these)
- Landlord consent, if a tenant applies
By community
DAMAC communities and their route
We confirm the route for your plot.
| Community | Approval route | Guides |
|---|---|---|
| DAMAC Hills DAMAC → DDA | DAMAC NOC by email, then DDA. | DAMAC Hills Modifications |
| DAMAC Hills 2 DAMAC → DDA | DAMAC NOC by email, then DDA. | Extensions Modifications |
| DAMAC Lagoons DAMAC → DDA | DAMAC NOC by email, then DDA. | DAMAC Lagoons |
How it works
6 steps to your DAMAC approval
1. Your idea
Community, villa and scope.
2. Drawings
Existing and proposed drawings, stamped calculations.
3. DAMAC NOC
Applied for by email.
4. DDA permit
Submitted by an approved consultant.
5. Works
Built to the approved drawings.
6. Sign-off
DDA and DAMAC inspection.
What owners ask us about
Common reasons for delays
- Missing stamped calculations
- Drawings that do not match the villa as built
- Tenant applying without landlord consent
- Works started before the DDA permit
Need a DAMAC NOC?
Get your DAMAC route today
Send us three things on WhatsApp:
- Your community and villa number
- Photos of the area
- What you want to build or change
We prepare the drawings, apply to DAMAC and submit to DDA as your consultant.
Questions
DAMAC NOC questions
How do I get a DAMAC NOC?
We prepare the drawings and stamped calculations and apply to DAMAC for the NOC by email. After the NOC, we submit to the Dubai Development Authority (DDA) for the permit.
Which authority approves works in DAMAC Hills?
The Dubai Development Authority (DDA), after the DAMAC NOC.
Is DAMAC Hills 2 also under DDA?
Yes, DAMAC NOC first, then DDA.
What about DAMAC Lagoons?
DAMAC NOC, then DDA.
Which works need a DAMAC NOC?
Extensions, pergolas, pools, boundary walls, facade changes, rooftop structures and structural changes such as removing a load-bearing wall.
Do I need a NOC for painting or flooring inside?
Internal finishes that do not touch the structure or the exterior usually do not.
Do I need structural calculations?
Yes, for extensions, pergolas, wall removals and any structural work. We prepare and stamp them.
Can a tenant apply for a DAMAC NOC?
With the landlord's written consent.
Does DAMAC charge for extensions?
DAMAC charges on added floor area; we explain how it works for your villa.
What happens after the works?
DDA and DAMAC inspect, then the completion and sign-off.
What if I built without a NOC?
We survey the works and help regularise them, or advise what must be removed.
Can you handle the whole process?
Yes: drawings, calculations, the DAMAC NOC, the DDA permit and completion.
Related guides
