Hand sketches instead of AutoCAD drawings, missing existing layouts, and drawings that do not match the scope letter are the usual reasons for comments. We prepare drawings in the format PID expects.
What Drawings Does PID Require for a NOC?
PID requires AutoCAD drawings as per its requirements, showing both the existing and the proposed layout. The drawings must match the contractor’s scope of work.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Existing and Proposed
The existing drawing shows the villa or apartment as it is today; the proposed drawing shows the changes. Together they let the PID OAM FM Team see exactly what will change.
How We Get It Done
01
Scope & Villa Reviewed
02
Owner, Tenant & Contractor Documents Collected
03
AutoCAD Drawings Prepared (Existing & Proposed)
04
PID NOC Application Submitted
05
PID OAM FM Team Verification
06
NOC Issued — DM Permit if Structural
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Common Drawing Problems
Situations We Help With
Interior Changes
Wall Removal
Extension
Landscape
External Changes
Missing Original Drawings
What Drawings Does PID Require for a NOC? at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the site and prepares drawings to the format of the developer and the authority. |
| 2 | PID Owners Association (master developer) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — Dubai Municipality, DDA or Trakhees — depending on the community | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
Key Technical Rules
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Site Survey
Our own team
Authority Format
DM, DDA, Trakhees
PDF + DWG
Ready to submit
Why Green Community & DIP Owners Choose Structural Solutions
PID Checklist Done Right
We prepare every item on the PID Minor Works / Fit-Out checklist — owner, tenant and contractor documents and undertakings — before submission.
AutoCAD Drawings In-House
Existing and proposed drawings prepared by our engineers in the format PID requires.
PID NOC + DM Permit in One Scope
Where works are structural, we carry the project from the PID OAM NOC through to the Dubai Municipality permit.
Start Your PID NOC Today
Tell us about your villa or apartment works — we will check the PID checklist, prepare the drawings and handle the submission.
What Drawings Does PID Require for a NOC? — FAQs
What drawings does PID require?
AutoCAD drawings showing the existing and proposed layout.
Are hand sketches accepted?
PID asks for AutoCAD drawings as per its requirements.
Must drawings match the scope?
Yes.
What if I have no original drawings?
We can survey and prepare existing drawings.
Can you prepare them?
Yes.