PID Scope of Work Letter Requirements

PID asks for a detailed scope of work on the contractor’s letterhead with the company stamp. It should describe exactly what will be done at the villa or apartment and match the AutoCAD drawings submitted with the NOC.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What a Good Scope Letter Includes

Property details (community, unit/villa number and type), a clear list of each work item and its location, materials or finishes where relevant, and confirmation of the main contractor — all on letterhead with stamp.

How We Get Your PID NOC

01

Scope & Villa Reviewed

02

Owner, Tenant & Contractor Documents Collected

03

AutoCAD Drawings Prepared (Existing & Proposed)

04

PID NOC Application Submitted

05

PID OAM FM Team Verification

06

NOC Issued — DM Permit if Structural

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Scope and Drawings Must Match

The FM Team checks the scope against the existing and proposed drawings. Items in the scope but missing from the drawings, or the other way round, are a common reason for comments.

Common Projects We Handle

Interior Renovation Scope

Fit-Out Scope

Landscape Scope

External Works Scope

Painting Scope

Structural Works Scope

Simple Approval Process

How Our Approval Process Works

We manage every stage of the approval process with accurate documentation, authority coordination, and expert engineering support.

Decorative line divider graphic

Quick Review

We review drawings and project requirements fast.

Plan Design

Our team prepares compliant
drawings and files.

Decorative line divider graphic

Easy Submit

We submit documents to
Dubai authorities safely.

Decorative line divider graphic

Final Permit

Receive approvals and
permits without delays.

Fit-Out Submission Packages Done Right DM Permits

Proven track record

Across Dubai

Established firm

Years of experience

Highly rated

By our clients

Why Green Community & DIP Owners Choose Structural Solutions

PID Checklist Done Right

We prepare every item on the PID Minor Works / Fit-Out checklist — owner, tenant and contractor documents and undertakings — before submission.

AutoCAD Drawings In-House

Existing and proposed drawings prepared by our engineers in the format PID requires.

PID NOC + DM Permit in One Scope

Where works are structural, we carry the project from the PID OAM NOC through to the Dubai Municipality permit.

Start Your PID NOC Today

Tell us about your villa or apartment works — we will check the PID checklist, prepare the drawings and handle the submission.

PID Scope of Work Letter Requirements — FAQs

What is the PID scope of work letter?

A detailed description of the works on the contractor’s letterhead with stamp.

Does it need a stamp?

Yes.

Must it match the drawings?

Yes — the scope and the existing/proposed drawings should match.

Who writes it?

The main contractor; we help align it with the drawings.

Can you review it?

Yes.