What codes are used for structural calculations in Dubai?
Structural design in Dubai follows the Dubai Building Code and the international standards accepted by the authority, such as Eurocodes, British Standards and American codes (ACI, AISC, ASCE). The consultant states the codes used in the calculation report.
The short answer
The authority checks that the design follows recognised codes for loads, concrete, steel, aluminium and foundations. Many submissions use Eurocodes or British Standards; others use American codes such as ACI for concrete, AISC for steel and ASCE for loads. The codes must be consistent and stated in the report.
What you need to know
- Loads: Dead, live and wind loads to the chosen standard.
- Concrete: For example Eurocode 2 or ACI.
- Steel: For example Eurocode 3, BS 5950 or AISC.
- Consistency: One set of codes used throughout.
Documents you will need
- Details of the proposed works
- Existing drawings
Who does what
Step by step
We confirm the exact route for your property.
| Step | Approval route | Guides |
|---|---|---|
| Design basis Structural Solutions | Codes and materials chosen. | — |
| Calculations Structural Solutions | Prepared to those codes. | Structural calculations in Dubai |
| Review Authority | Checked against accepted codes. | — |
Questions
Related questions
Does Dubai have its own building code?
Yes, the Dubai Building Code, used together with accepted international standards.
Can I mix codes?
The design should use a consistent set of codes.
Which code is used for steel?
Commonly Eurocode 3, BS 5950 or AISC.
Which code is used for wind?
The chosen loading standard, as accepted by the authority.
What does Structural Solutions do?
Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.
Related guides
