Nakheel Curb Cut NOC

Cutting or lowering the kerb in front of a villa in a Nakheel community to create or widen a driveway needs Nakheel’s approval as part of the plot access NOC — together with RTA approvals for the access design and the works in the road reserve.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What a Curb Cut Involves

The existing kerb is cut or lowered, the footpath is adjusted and the driveway is tied into the carriageway. Because this touches the road edge and the sidewalk, it is reviewed by both Nakheel and RTA.

How We Get Your Plot Access Approved

01

Site Survey & Plot Limits (DLTM)

02

RTA Access Design Study

03

Developer Plot Access NOC

04

RTA Construction NOC

05

RTA Sidewalk Modification Permit

06

Works, Handover & Deposit Refund

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Drawings Nakheel Expects

A survey-based layout showing the plot limit, the new kerb cut position and width, the interlock and the tie-in levels — submitted as PDF and AutoCAD in DLTM coordinates.

Projects We Handle

New Driveway Kerb Cut

Kerb Lowering

Driveway Widening

Second Access

Gate Relocation

Garage Conversion Access

Nakheel Curb Cut NOC at a Glance

StepWhoWhat happens
1Structural engineerSurveys the plot and prepares access, kerb and interlock drawings in PDF and AutoCAD DLTM.
2RTAAccess design study (concept approval).
3NakheelPlot access, curb cut and interlock NOC where the community has one.
4RTAConstruction NOC, then the sidewalk modification permit.
5RTA and developerInspection after works and security deposit refund.

Documents Required

  • Title deed and affection plan
  • Owner passport and Emirates ID copy
  • Survey-based drawings in PDF and AutoCAD DLTM
  • RTA-approved access design (for the developer NOC)

Key Technical Rules

  • Order of approvals: RTA access design study → developer plot access NOC → RTA construction NOC → sidewalk modification permit.
  • DLTM drawings: developers such as Nakheel return drawings that are not PDF plus AutoCAD DLTM.
  • Outside the plot limit: kerb, verge and interlock works are in the road reserve.
  • No early works: concept approval alone does not allow works on site.
  • Deposit refund: after the works are inspected and accepted.
RTA parking and access approval in Dubai — Structural Solutions

RTA Design Study

First step

DLTM Drawings

PDF + AutoCAD

Sidewalk Permit

Before works

Why Owners Choose Structural Solutions

Full Access Approval Chain

RTA access design study, developer plot access NOC, RTA construction NOC and sidewalk modification permit — coordinated in one scope.

DLTM Drawings From Site Survey

We survey the site and prepare AutoCAD drawings in DLTM coordinates plus PDF — the format Nakheel, RTA and other developers ask for.

Fewer Returned Submissions

Plot limit, access, kerb, interlock and the tie-in to the existing carriageway are shown clearly, so reviewers have what they need.

Get Your Plot Access Approved

Send us your affection plan and what you want to build at the plot entrance — we will survey, prepare the DLTM drawings and handle the RTA and developer approvals.

Nakheel Curb Cut NOC — FAQs

Do I need a Nakheel NOC for a curb cut?

Yes — in Nakheel communities the curb cut is approved under the Nakheel Plot Access, Curb Cut & Interlock NOC.

Is RTA involved?

Yes — the RTA access design study comes before the Nakheel NOC, and the RTA construction NOC and sidewalk permit follow it.

Do you prepare the access drawings?

Yes — we survey the site and prepare access, kerb, interlock and tie-in drawings in AutoCAD (DLTM) and PDF.

Can works start before all approvals?

No — access, kerb and interlock works should start only after the RTA construction NOC and sidewalk modification permit are issued.

Who handles the submissions?

We prepare the drawings and handle the RTA and developer submissions as your consultant.