wasl reviews new works against what is approved, so differences can hold up your new approval.
My Villa Does Not Match the Original Drawings: What Now?
It happens often. Report the differences to wasl, then either get the changes approved retrospectively or adjust them. We survey the villa and prepare the drawings for both.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Typical Differences
Enclosed terraces, moved walls, garage conversions, extra rooms or pergolas added by previous owners.
How It Works in Jumeirah Golf Estates
01
Photos, Plot Details and Your Idea
02
Check Against the JGE Guidelines
03
Sketch and Early Feedback
04
wasl Concept and Detailed Design Review
05
Trakhees Building Permit
06
Works, Inspection and Completion
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Why Fix It First
What JGE Owners Ask Us About
Moved Walls
Enclosed Terrace
Garage Room
Extra Room
Pergola
Roof Changes
My Villa Does Not Match the Original Drawings: What Now: The Short Answer
| Step | Who | What happens |
|---|---|---|
| 1 | You and our engineers | Your idea, photos and plot details. We get the as-built plans from wasl and check them against the villa. |
| 2 | wasl Urban Management (JGE NOC / DRC) | Reviews the concept design, then the detailed design, against the JGE Building Guidelines. Applied through the JGE portal or the Wasl App. |
| 3 | Trakhees | Building permit for structural works. |
| 4 | wasl and Trakhees | Inspections and completion. |
The JGE Rules That Matter Here
- As-built plans: wasl provides the as-built plans from the Trakhees completion records; check them against your villa before design
- Changes on site: any change during works needs wasl approval; wasl can stop works that do not match the approved design
What to Send Us
- Title deed and owner ID
- Photos of the villa and the area to change
- As-built floor plans (wasl provides these from the Trakhees completion records)
- Your idea: a sketch is enough to start
- Drawings at 1:100 or larger for the wasl review (we prepare these)
JGE Guidelines
Checked first
wasl Review
Concept and detailed
Trakhees Permit
For structural works
Why JGE Owners Work With Us
We Know the JGE Rules
We check your idea against the JGE Building Guidelines before you spend money on full drawings.
wasl and Trakhees Handled
We prepare the drawings and handle the wasl Urban Management review and the Trakhees permit.
Engineers In-House
Structural checks, lift openings, mezzanines and extensions designed and stamped by our engineers.
Tell Us What You Want to Change
Send us photos, your plot details and your idea. We will tell you what is possible in JGE and handle the approvals.
My Villa Does Not Match the Original Drawings: What Now? FAQs
What if my villa does not match the plans?
Report it and get the differences approved or corrected.
Who approves changes to my JGE villa?
wasl Urban Management (the JGE NOC / DRC team) reviews the design, then Trakhees issues the building permit.
Do I need full drawings to ask if my idea is possible?
No. A sketch and photos are often enough for an early indication before full drawings.
What rules does wasl check?
The JGE Building Guidelines: floor area, plot coverage, setbacks, height, building envelope and style.
Can you handle everything for me?
Yes. We check your idea, prepare drawings and calculations, and handle the wasl review and the Trakhees permit.
