How Do I Apply for a Renovation NOC in Tilal Al Ghaf?

Through the Majid Al Futtaim app. You submit the request with the title deed, owner ID, photos, the villa plans and drawings of the works. After the NOC, structural works need a DDA building permit. We prepare the drawings and calculations and help you submit.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What to Submit

Title deed, owner ID, photos of the area, the villa plans and drawings of the proposed works. Structural works also need calculations from an engineer.

How It Works in Tilal Al Ghaf

01

Your Idea, Photos and Plot Details

02

Villa Plans and Site Survey

03

Sketch and Early Check

04

Drawings and Structural Calculations

05

Majid Al Futtaim NOC via the App

06

DDA Permit, Works and Completion

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

After the Majid Al Futtaim NOC

DDA issues the building permit for structural works. Pools also need the DM Environment Department NOC.

What Tilal Al Ghaf Owners Ask Us About

Extension

Pool

Pergola

Landscaping

Wall Removal

Lift

How Do I Apply for a Renovation NOC in Tilal Al Ghaf: The Short Answer

StepWhoWhat happens
1You and our engineersYour idea, photos and plot details. We check your villa plans against what is built, or survey the villa.
2Majid Al Futtaim (app)Reviews the design against its community rules and issues the NOC.
3DDABuilding permit for structural works.
4Majid Al Futtaim and DDAInspections and completion.

What Majid Al Futtaim and DDA Look At Here

  • Apply through the app: NOC requests are submitted through the Majid Al Futtaim app
  • Documents: title deed, owner ID, photos, villa plans and drawings
  • DDA permit: structural works need a DDA building permit after the NOC
  • Structure checked: our engineers check the structure and stamp the calculations

What to Send Us

  • Title deed and owner ID
  • Photos of the villa and the area to change
  • Villa plans from your handover documents (or we survey the villa)
  • Your idea: a sketch is enough to start
  • Drawings and structural calculations (we prepare these)
Engineer inspecting villa works for regularisation in Dubai — Structural Solutions

MAF NOC

Applied through the app

Villa Plans

From handover or our survey

DDA Permit

For structural works

Why Tilal Al Ghaf Owners Work With Us

We Check Before You Spend

We tell you early if your idea is realistic for your villa, before full drawings.

Majid Al Futtaim and DDA Handled

We prepare the drawings, submit through the Majid Al Futtaim app and handle the DDA permit.

Engineers In-House

Extensions, openings, lifts, pools and shades designed and stamped by our own engineers.

Tell Us What You Want to Change

Send us photos, your plot details and your idea. We will tell you what is possible and handle the Majid Al Futtaim and DDA approvals.

How Do I Apply for a Renovation NOC in Tilal Al Ghaf? FAQs

How do I apply for a NOC in Tilal Al Ghaf?

Through the Majid Al Futtaim app.

Who approves changes to my Tilal Al Ghaf villa?

Majid Al Futtaim issues the NOC through the Majid Al Futtaim app, then DDA issues the building permit for structural works.

Do I need full drawings to ask if my idea is possible?

No. Photos and a simple sketch are enough for us to give you an early answer.

Can I get the plans of my villa?

Use the plans from your handover documents. If you do not have them, we survey the villa.

Can you handle everything for me?

Yes. We check the idea, prepare drawings and calculations, submit to Majid Al Futtaim and handle the DDA permit.