Steel · Verification

Does a steel structure need specialist verification?

Yes. Steel works need specialist verification and a stamp before approval. We help you arrange it.

The short answer

Yes. Steel works in Dubai need specialist verification and a specialist stamp before approval, covering the steel members and connections. This applies to steel pergolas, canopies, car shades, staircases, mezzanines and warehouse structures. Structural Solutions prepares the steel calculations and drawings and helps you arrange the specialist verification and stamp, then handles the NOC and permit.

NeededYes
CoversMembers and connections
We helpArrange it for you

What you need to know

  • Calculations: Stamped steel calculations.
  • Connections: Part of the design.
  • Specialist stamp: Required for steel works.
  • Approvals: NOC and permit.

Documents you may need

  • Title deed or tenancy contract
  • Developer or landlord NOC
  • Steel drawings and stamped calculations
  • Photos of the location

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Design and calculations
Structural Solutions
Steel members, connections and stamped calculations.Steel calculations
Specialist verification and stamp
Specialist
Steel works need specialist verification and a stamp; we help you arrange it.Specialist stamp
Approvals
Developer and authority
NOC and permit where the works need them.Approvals
Fabrication and erection
Your steel contractor
Built to the approved drawings.—
Inspection
Authority
Inspection and completion.—

Questions

Related questions

Is it needed for a small steel pergola?

Steel works need specialist verification; we confirm for your structure.

Can you arrange it?

Yes, we help you arrange it.

What does a connection design include?

Bolts, welds, plates and how members join.

Who builds the steel?

Your steel contractor, to the approved drawings.

Related guides

Keep reading