Steel · PEB Warehouses

Does a PEB warehouse need approval?

Yes. A pre-engineered steel building needs stamped calculations, specialist verification, the building permit and DCD approval.

The short answer

Yes. A PEB (pre-engineered building) warehouse is a steel structure, so it needs stamped structural calculations, specialist verification and a stamp for the steel, foundations designed from a soil test, the building permit from the authority for the area, and Dubai Civil Defence (DCD) approval. Structural Solutions designs or reviews the PEB, prepares the calculations and handles the approvals.

NeedsCalculations and specialist stamp
PermitAuthority for the area
AlsoDCD approval

What you need to know

  • Steel: Specialist verification and stamp.
  • Foundations: Soil test required.
  • Authority: DM, DDA or Trakhees, depending on the area.
  • Fire safety: DCD approval.

Documents you may need

  • Title deed or tenancy contract
  • Developer or landlord NOC
  • Steel drawings and stamped calculations
  • Photos of the location

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Design and calculations
Structural Solutions
Steel members, connections and stamped calculations.Steel calculations
Specialist verification and stamp
Specialist
Steel works need specialist verification and a stamp; we help you arrange it.Specialist stamp
Approvals
Developer and authority
NOC and permit where the works need them.Approvals
Fabrication and erection
Your steel contractor
Built to the approved drawings.—
Inspection
Authority
Inspection and completion.—

Questions

Related questions

Can the PEB supplier's calculations be used?

We review them and stamp them if they meet the requirements.

Does a PEB extension need approval?

Yes.

Does it need DCD?

Yes.

Who designs the foundations?

Our engineers, from the soil test.

Related guides

Keep reading