Structural calculations

Do I need structural calculations for a villa extension?

Yes. A villa extension adds new structure and load, so the developer and the authority require stamped structural calculations with the drawings, covering the new foundations, columns, beams and slabs, and any connection to the existing villa.

The short answer

Whether it is a ground-floor room, an extra floor or a covered terrace, an extension changes how loads go to the ground. The calculations check the new elements, the existing structure where the extension connects or adds load, and the foundations. They are submitted with the drawings for the developer NOC and the DM, DDA or Trakhees permit.

RequiredYes, for every extension
What is checkedNew and existing structure, foundations
Submitted withDrawings, for NOC and permit

What you need to know

  • Ground-floor rooms: New foundations and walls or frame.
  • Extra floor: The existing structure must carry the new floor.
  • Covered terraces: Roof structure, columns and foundations.
  • Connections: How the new part joins the existing villa.

Documents you will need

  • Title deed and owner ID
  • Affection plan for the plot
  • Developer NOC where the community has a developer
  • Existing drawings or as-built plans
  • Photos of the area

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Survey
Structural Solutions
Existing villa and as-built plans checked.—
Calculations and drawings
Structural Solutions
New and existing structure.Structural calculations in Dubai
Developer NOC
Developer
Approval of the extension.Developer NOCs
Permit
DM, DDA or Trakhees
Building permit.Villa extension NOC

Questions

Related questions

Can my villa take an extra floor?

Only if the existing structure and foundations can carry it; the calculations show this.

Does the developer need the calculations?

They are part of the package for the NOC and the permit.

Do I need calculations for a small room?

Yes, any new structure needs them.

Who prepares them?

An approved consultant.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.

Related guides

Keep reading