Structural calculations

Do I need structural calculations for a roof water tank?

A full water tank is heavy, so the roof slab and supports should be checked by an engineer before adding or enlarging one. Where the works change the structure or add a new support frame, the calculations are also part of the approval.

The short answer

Water weighs about one tonne per cubic metre, so even a modest tank puts a concentrated load on the roof. Our engineers check the slab, beams and the tank support, and design a frame or plinth that spreads the load if needed. Whether a NOC or permit is required depends on the community and the works.

WhyWater tanks are heavy point loads
What is checkedSlab, beams and support frame
ApprovalDepends on the community and works

What you need to know

  • Tank weight: About one tonne per cubic metre of water, plus the tank.
  • Slab capacity: The existing slab and beams are checked.
  • Support: A frame or plinth to spread the load.
  • Approvals: We confirm what your community requires.

Documents you will need

  • Title deed and owner ID
  • Affection plan for the plot
  • Developer NOC where the community has a developer
  • Existing drawings or as-built plans
  • Photos of the area

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Check
Structural Solutions
Slab, beams and tank position.Structural calculations in Dubai
Design
Structural Solutions
Support frame or plinth if needed.—
Approvals
Developer or authority
Where required for the works.—

Questions

Related questions

How heavy is a roof water tank?

Water is about one tonne per cubic metre, plus the tank itself.

Can I put a larger tank on my roof?

Only after the slab and supports are checked.

Do solar panels need the same check?

Yes, roofs are checked for solar loads too.

Do I need a NOC?

It depends on the community and the works; we confirm.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.