Structural calculations

Do I need structural calculations for a pergola?

Yes. Developers and authorities ask for stamped calculations for pergolas, covering the columns, beams, roof, foundations and fixings, especially for wind loads. They are submitted with the drawings for the NOC and, where needed, the permit.

The short answer

A pergola looks light, but wind acting on its roof can lift and push it. The calculations check the frame, the roof or louvres, the foundations and every fixing, whether the pergola is timber, steel or aluminium. At sign-off, the pergola is inspected against the approved drawings.

RequiredYes, stamped calculations
Main loadWind
Checked at sign-offSize, height and fixings

What you need to know

  • Columns and beams: Sized for wind and roof loads.
  • Foundations: Footings or base plates and anchors.
  • Roof: Fixed, louvered or fabric.
  • Materials: Timber, steel or aluminium.

Documents you will need

  • Title deed and owner ID
  • Affection plan for the plot
  • Developer NOC where the community has a developer
  • Existing drawings or as-built plans
  • Photos of the area

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Design
Structural Solutions
Drawings and stamped calculations.Pergola calculations
Developer NOC
Developer
Size, position and look.Pergola NOC
Permit
Authority
Where the pergola needs one.—
Sign-off
Inspectors
Checked against the drawings.Pergola sign-off

Questions

Related questions

Do aluminium pergolas need calculations?

Yes, the same as timber or steel.

Do car shades need calculations?

Yes.

Can the installer use their own design?

It must match the approved, stamped design.

What is the main risk?

Wind uplift on the roof and fixings.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.

Related guides

Keep reading