Do I need approval to install racking in my warehouse?

Yes. Racking is treated as a structure: it needs stamped calculations, including anchors and slab loads, approval from the authority for the area and DCD approval for fire safety. Racking already installed without approval can often be assessed and regularised.

The short answer

Racking concentrates heavy loads through its uprights into the slab, and affects fire safety and escape routes. Our engineers check the racking design, anchors and slab capacity, and prepare the package for Dubai Municipality, DDA or Trakhees CED depending on the area, plus DCD.

RequiredCalculations and approval
ChecksRacking, anchors, slab
AuthorityBy area, plus DCD

What you need to know

  • Racking design: Uprights, beams and bracing.
  • Anchors: Fixings into the slab.
  • Slab: Capacity for the racking loads.
  • Fire safety: Clearances, sprinklers and escape routes.

Documents you will need

  • Trade licence and tenancy contract (Ejari)
  • Landlord or building management NOC
  • Unit plans
  • Drawings and stamped calculations
  • Fire safety drawings

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Check
Structural Solutions
Racking, anchors and slab.Racking calculations
Approval
Authority for the area
Approval of the racking.—
DCD
DCD
Fire safety approval.—
Sign-off
Inspectors
Final inspection.Racking sign-off

Questions

Related questions

Does racking need approval in JAFZA?

Yes, through Trakhees CED.

What if racking was installed without approval?

It can often be assessed and regularised.

Is the slab checked?

Yes, for the racking loads.

Does DCD check racking?

DCD checks the fire safety around it.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.