What is a VSR in Nakheel communities?
A VSR is Nakheel's Villa Status Report. It shows unapproved changes to the villa, which need fixing before a sale.
The short answer
A VSR is the Villa Status Report from Nakheel. It shows the status of the villa against the approved drawings, including any unapproved changes such as extensions, enclosures or structures. Unapproved changes shown on the VSR need fixing, through approval or removal, before the villa is sold. Structural Solutions surveys the villa, prepares the drawings and calculations, and handles the Nakheel NOC and the Trakhees permit to regularise the works.
What you need to know
- Nakheel areas: Palm Jumeirah, Jumeirah Park, Jumeirah Islands, Al Furjan, JVC and more.
- Unapproved works: Approved through regularisation, or removed.
- Route: Nakheel NOC, then the Trakhees permit.
- Drawings: Nakheel provides villa plans to owners; we prepare as-built drawings.
Documents you may need
- Title deed and owner ID
- Approved drawings and the building permit
- As-built drawings
- Owner letter
- Developer NOC (where applicable)
Who does what
Step by step
We confirm the exact route for your project.
| Step | Approval route | Guides |
|---|---|---|
| As-built drawings Structural Solutions | Drawings that match what was built. | As-built drawings |
| Developer inspection Developer | Where the community has a developer. | — |
| Authority inspection DM, DDA or Trakhees | Final inspection; the order with the developer can vary. | — |
| Owner letter Owner | Required for the completion certificate. | Owner letter |
| Completion certificate Authority | Closes the permit; any deposit is returned after clearance. | Request sign-off online |
Questions
Related questions
Why does the VSR matter when selling?
Unapproved changes on the VSR need fixing before the sale.
Can unapproved works be approved?
Often yes, through regularisation with drawings and calculations.
Who submits to Nakheel?
We apply through the Nakheel online portal for you.
Then what?
The Trakhees permit and completion.
Related guides
