Warehouses

What approvals does a warehouse extension need?

Stamped structural calculations and drawings, the approval of the authority for the area (Dubai Municipality in Al Quoz or DIP, Trakhees CED in JAFZA, DDA in Dubai Industrial City), DCD approval, then inspection and completion.

The short answer

Warehouse extensions add structure, often steel frames, roof and cladding, and change fire safety. Our engineers design the extension and check any connection to the existing building. The package goes to the authority for the area, DCD approves fire safety, and both inspect before completion.

DesignStamped calculations and drawings
AuthorityDM, Trakhees CED or DDA by area
Fire safetyDCD

What you need to know

  • Al Quoz and DIP: Dubai Municipality.
  • JAFZA: Trakhees CED.
  • Dubai Industrial City: DDA.
  • DCD: Approval and final inspection for warehouse works.

Documents you will need

  • Trade licence and tenancy contract (Ejari)
  • Landlord or building management NOC
  • Unit plans
  • Drawings and stamped calculations
  • Fire safety drawings

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Design
Structural Solutions
Extension design and calculations.—
Approval
Authority for the area
Building approval.—
DCD
DCD
Fire safety approval.Warehouse DCD
Completion
Authority and DCD
Inspections and completion.Warehouse sign-off

Questions

Related questions

Who approves a warehouse extension in Al Quoz?

Dubai Municipality.

Who approves it in JAFZA?

Trakhees CED.

Is DCD needed?

Yes, for warehouse works.

Do steel extensions need verification?

Sometimes the authority asks for third-party verification.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.