Third-party verification

What is the difference between a consultant and third-party verification?

The design consultant prepares the design and submits it for approval. A third-party verifier is a different, independent consultant who checks that design or the built works, when an authority or owner asks for an independent check.

The short answer

Both are approved consultants, but with different roles. The consultant of record designs, calculates, submits and follows the project. The third-party verifier only checks independently and stamps a verification. Dubai Municipality, DDA and Trakhees can ask for this extra check on certain works.

ConsultantDesigns and submits
Third-party verifierIndependently checks
BothApproved consultants

What you need to know

  • Role: Design and submission vs independent check.
  • When: Every project vs when requested.
  • Independence: The verifier did not design it.
  • Output: Approval package vs stamped verification.

Documents you will need

  • Design package
  • Authority request

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Design
Consultant of record
Drawings and calculations.Structural calculations in Dubai
Verification
Independent consultant
Check and stamp.Third-party structural verification
Approval
Authority
Reviews both.—

Questions

Related questions

Can one consultant do both?

Not for the same design; the verifier must be independent.

Do all projects need verification?

No, only when the authority or owner asks.

Which authorities ask for it?

Dubai Municipality, DDA and Trakhees, for certain works.

Can Structural Solutions be either?

Yes, designer on one project or verifier on another.

What does Structural Solutions do?

Design as consultant of record, or independent verification.