Structural calculations

Do I need structural calculations to remove a wall?

If the wall is load-bearing, yes: an engineer must check it and design the beam or support that replaces it, with stamped calculations for the approval. If it is a non-structural partition, a check still confirms that before you remove it.

The short answer

Many villa and apartment walls carry floors or roofs above them. Before removing or opening a wall, our engineers check what it supports. A load-bearing wall needs a new beam or frame designed and stamped, then the developer or building management NOC and the authority permit. In towers, walls are often shear walls that cannot be removed.

FirstCheck if the wall is load-bearing
If it isBeam or frame design, stamped
ThenNOC and permit

What you need to know

  • Load-bearing walls: Need a designed replacement beam or frame.
  • Partitions: Can usually be removed after a check.
  • Tower walls: Often shear walls that cannot be removed.
  • Openings: A new opening also needs a lintel or beam design.

Documents you will need

  • Title deed and owner ID
  • Affection plan for the plot
  • Developer NOC where the community has a developer
  • Existing drawings or as-built plans
  • Photos of the area

Who does what

Step by step

We confirm the exact route for your property.

StepApproval routeGuides
Wall check
Structural Solutions
Find out what the wall supports.—
Design
Structural Solutions
Beam, frame or lintel with stamped calculations.Structural calculations in Dubai
NOC and permit
Developer and authority
Approval of the removal.Wall removal NOC
Sign-off
Inspectors
Works checked against the drawings.Wall removal sign-off

Questions

Related questions

How do I know if a wall is load-bearing?

An engineer checks the drawings and the wall on site.

Can I remove a wall in my apartment?

Only after a structural check; tower walls are often shear walls.

Do I need approval to remove a partition?

In most communities, yes, at least the developer NOC and inspection.

What replaces a load-bearing wall?

A designed beam or frame.

What does Structural Solutions do?

Our engineers prepare and stamp the calculations and drawings, and handle the NOC, permit and completion as approved consultant.

Related guides

Keep reading