DDA issues the building permit for structural works. Pools also need the DM Environment Department NOC.
How Do I Apply for a Renovation NOC in Tilal Al Ghaf?
Through the Majid Al Futtaim app. You submit the request with the title deed, owner ID, photos, the villa plans and drawings of the works. After the NOC, structural works need a DDA building permit. We prepare the drawings and calculations and help you submit.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
What to Submit
Title deed, owner ID, photos of the area, the villa plans and drawings of the proposed works. Structural works also need calculations from an engineer.
How It Works in Tilal Al Ghaf
01
Your Idea, Photos and Plot Details
02
Villa Plans and Site Survey
03
Sketch and Early Check
04
Drawings and Structural Calculations
05
Majid Al Futtaim NOC via the App
06
DDA Permit, Works and Completion
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
After the Majid Al Futtaim NOC
What Tilal Al Ghaf Owners Ask Us About
Extension
Pool
Pergola
Landscaping
Wall Removal
Lift
How Do I Apply for a Renovation NOC in Tilal Al Ghaf: The Short Answer
| Step | Who | What happens |
|---|---|---|
| 1 | You and our engineers | Your idea, photos and plot details. We check your villa plans against what is built, or survey the villa. |
| 2 | Majid Al Futtaim (app) | Reviews the design against its community rules and issues the NOC. |
| 3 | DDA | Building permit for structural works. |
| 4 | Majid Al Futtaim and DDA | Inspections and completion. |
What Majid Al Futtaim and DDA Look At Here
- Apply through the app: NOC requests are submitted through the Majid Al Futtaim app
- Documents: title deed, owner ID, photos, villa plans and drawings
- DDA permit: structural works need a DDA building permit after the NOC
- Structure checked: our engineers check the structure and stamp the calculations
What to Send Us
- Title deed and owner ID
- Photos of the villa and the area to change
- Villa plans from your handover documents (or we survey the villa)
- Your idea: a sketch is enough to start
- Drawings and structural calculations (we prepare these)
MAF NOC
Applied through the app
Villa Plans
From handover or our survey
DDA Permit
For structural works
Why Tilal Al Ghaf Owners Work With Us
We Check Before You Spend
We tell you early if your idea is realistic for your villa, before full drawings.
Majid Al Futtaim and DDA Handled
We prepare the drawings, submit through the Majid Al Futtaim app and handle the DDA permit.
Engineers In-House
Extensions, openings, lifts, pools and shades designed and stamped by our own engineers.
Tell Us What You Want to Change
Send us photos, your plot details and your idea. We will tell you what is possible and handle the Majid Al Futtaim and DDA approvals.
How Do I Apply for a Renovation NOC in Tilal Al Ghaf? FAQs
How do I apply for a NOC in Tilal Al Ghaf?
Through the Majid Al Futtaim app.
Who approves changes to my Tilal Al Ghaf villa?
Majid Al Futtaim issues the NOC through the Majid Al Futtaim app, then DDA issues the building permit for structural works.
Do I need full drawings to ask if my idea is possible?
No. Photos and a simple sketch are enough for us to give you an early answer.
Can I get the plans of my villa?
Use the plans from your handover documents. If you do not have them, we survey the villa.
Can you handle everything for me?
Yes. We check the idea, prepare drawings and calculations, submit to Majid Al Futtaim and handle the DDA permit.
