MBR City Villa As-Built Drawings

As-built drawings show the villa exactly as it stands today — needed when original drawings are missing, after past changes, before new applications and before selling. We handle this for homes in MBR City, working with the community developer and DM.

We get your drawings for you

No need to chase the developer or the authority yourself. Send us your title deed, Emirates ID or passport and a signed authorisation letter: we request your approved drawings, or survey the property and prepare new as-built drawings. You receive PDF, and CAD where available.

How to get your property drawings →Request online →WhatsApp us
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Why It Matters in MBR City

As-built drawings show the villa exactly as it stands today — needed when original drawings are missing, after past changes, before new applications and before selling.

How We Handle It

01

Site Visit & Measured Survey

02

Existing Documents Reviewed

03

AutoCAD Drafting

04

Engineer Review

05

Drawings Issued

06

Ready for Next Application

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

What We Prepare

We survey the villa on site and prepare AutoCAD drawings in DM format, ready to use as the base for the next developer NOC or DM application. MBR City homes are larger, custom-designed residences, so each scheme is reviewed individually against the community’s design rules.

Common Villa As-Built Drawings Projects in MBR City

Original Drawings Missing

Before a New Extension

After Unapproved Works

Before Selling

For Regularisation

For Completion Certificate

MBR City Villa As-Built Drawings at a Glance

StepWhoWhat happens
1Structural engineerSurveys the site and prepares drawings to the format of the developer and the authority.
2Master developer (where the community has one)Issues the community NOC against its design guidelines.
3Building authority — DMBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Any existing drawings (PDF or CAD)
  • Access to the site for the survey

Key Technical Rules

  • Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
  • Authority format: prepared to the Dubai Municipality submission format.
  • DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
  • Existing and proposed: both sets are shown so reviewers can see the change.
  • PDF and DWG: issued in both formats for submission.
As-built drawings and measured survey in Dubai — Structural Solutions

Site Survey

Our own team

Authority Format

Dubai Municipality

PDF + DWG

Ready to submit

Why MBR City Owners Choose Structural Solutions

DM Submissions

We prepare drawings and calculations in DM format and manage the permit through to completion.

Developer NOC Coordination

We prepare the community NOC submission to the guidelines for MBR City, so it is right the first time.

Engineering In-House

Structural design, calculations and drawings by our own engineers.

Start Your MBR City Project

Tell us about your home in MBR City and what you plan to change — we will confirm the approvals, prepare the drawings and handle the submissions.

MBR City Villa As-Built Drawings — FAQs

When do I need as-built drawings in MBR City?

When original drawings are missing, after past changes, before new applications and before selling.

Who issues building permits in MBR City?

Dubai Municipality (DM), after the community developer NOC.

Is the developer NOC separate from the DM permit?

Yes. The developer NOC covers community rules; the DM permit covers the structural and building approval. Both are needed.

Do you prepare DM format drawings?

Yes — architectural and structural drawings and calculations in DM format.

Can you handle the whole process?

Yes, from the first drawings to the completion certificate.

More MBR City Guides

Get Your Approval Now!