Car Park Structural Assessment Dubai | RTA-Ready Structural Package

A car park structural assessment establishes whether an existing or proposed parking structure — surface, basement, or multi-storey — can safely carry its intended load, and produces the calculations RTA requires as part of parking approval. Structural Solutions delivers assessment reports ready for direct RTA submission.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

What a Car Park Structural Assessment Covers

The assessment covers slab load capacity, column and beam adequacy for multi-storey structures, ramp gradient and structural design, and — for basement parking — retaining wall and waterproofing structural integrity. The scope depends on whether the car park is new, existing, or being extended.

Assessment Process

01

Site Visit & Existing Structure Review

02

Load Capacity Calculation

03

Column, Beam & Slab Assessment

04

Ramp & Access Structural Check (Where Applicable)

05

Report Preparation

06

RTA-Ready Submission Package

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

When You Need This Assessment

A structural assessment is required for any new multi-storey or basement car park, any change of use that adds parking capacity to an existing structure, and any older car park where RTA or your building permit application requires updated structural certification.

Assessment Scope by Car Park Type

Surface Parking

Ground-bearing load check

Basement Parking

Retaining wall, waterproofing, slab load

Multi-Storey Parking

Column, beam, ramp, full structural calculations

Car Park Structural Assessment Dubai at a Glance

StepWhoWhat happens
1Structural engineerPrepares the structural design and calculations and stamps them as an authority-registered consultant.
2Master developer (where the community has one)Issues the community NOC against its design guidelines.
3Building authority — Dubai Municipality, DDA or Trakhees — depending on the communityBuilding permit; work starts only after it is issued.
4Developer and authorityCompletion inspection and sign-off.

Documents Required

  • Title deed (or tenancy contract plus landlord NOC for tenants)
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Architectural or shop drawings of the element
  • Existing structural drawings, if available

Key Technical Rules

  • Registered engineer: calculations are stamped by an authority-registered consultant.
  • Loads to code: dead, live and wind loads to the applicable codes.
  • Connections designed: fixings, base plates and connections are included.
  • Existing structure checked: where new loads are added to an existing building.
  • Match the drawings: calculations must match the drawings submitted.

Extension/Retrofit

Existing structure capacity re-assessment

Loads to Code

Dead, live and wind

Connections

Fixings designed

Highly rated

By our clients

Why Choose Structural Solutions

RTA-Ready Reports

Assessment reports formatted and prepared for direct RTA submission, not generic engineering reports.

All Car Park Types

Surface, basement, and multi-storey assessment experience across warehouse, industrial, and commercial projects.

Assessment to Approval

We can carry your assessment straight into RTA parking approval submission as one continuous process.

Structural Solutions delivers RTA-ready structural assessment reports for car parks across Dubai.

Get Free Consultation

Car Park Structural Assessment — FAQs

Does every car park need a structural assessment?

Multi-storey and basement car parks almost always need one; surface lots need one when load-bearing conditions or use changes.

What do you need from me to get started?

Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works — we confirm the approvals needed and prepare the submission.

Can this be submitted directly to RTA?

Yes — our reports are prepared in RTA-ready format for direct submission.

What if my car park was built without structural drawings?

We can conduct an as-built assessment based on site survey and testing where original drawings aren't available.

Do you handle the RTA submission as well?

Yes — we can manage the full process from assessment through RTA approval.