The Walk JBR F&B Kitchen, Exhaust & Grease Trap Approval

The technical heart of any F&B fit-out at The Walk JBR — kitchen exhaust systems and grease trap installations — need specific engineering documentation before approval.

Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa

Streamlined

Approval process

End-to-end

NOC to permit, managed

Direct access

To your project team

Always on

Client support

Kitchen Exhaust & Grease Trap Requirements

Kitchen exhaust systems must be sized correctly for the cooking equipment and ducted to an approved discharge point, while grease traps need capacity sized to the kitchen's output — both require technical documentation as part of your fit-out approval.

Exhaust & Grease Trap Process

01

Kitchen Equipment & Cooking Load Assessment

02

Exhaust System Sizing & Routing Design

03

Grease Trap Capacity Sizing

04

Documentation Submission

05

Authority Review

06

Installation & Inspection

How Our Approval Process Works

Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.

Why Sizing Matters

An undersized exhaust system fails to clear cooking fumes properly, while an undersized grease trap leads to blockages and potential fines — correct sizing from the start avoids operational problems after opening.

Exhaust & Grease Trap At a Glance

Cooking Load Assessment

Exhaust System Sizing

Duct Routing Design

Grease Trap Sizing

Documentation Package

Installation Inspection

The Walk JBR F&B Kitchen, Exhaust & Grease Trap Approval at a Glance

StepWhoWhat happens
1Structural engineerPrepares the fit-out drawings, structural checks and stamped calculations where needed.
2Landlord, building management or mallIssues the NOC for the works.
3Authority — Dubai Municipality, DDA or Trakhees — depending on the communityReviews the drawings and issues the permit.
4Civil Defence (DCD)Fire and life safety approval where required.
5Landlord and authorityCompletion inspection.

Documents Required

  • Trade licence
  • Tenancy contract or Ejari
  • Landlord, building management or mall NOC
  • Proposed layout and fit-out drawings
  • Structural calculations where loads or openings change

Key Technical Rules

  • Landlord or mall NOC: required before the authority submission.
  • Authority permit: from DM, DDA, Trakhees or the free zone, depending on the location.
  • Civil Defence: fire and life safety approval where the activity requires it.
  • Structural check: for new loads, openings or mezzanines.
  • Completion inspection: before the unit opens.
Apartment renovation permit Dubai

Landlord NOC

First approval

Authority Permit

By location

Civil Defence

Where required

Why Project Owners Choose Structural Solutions

F&B MEP Expertise

We size and document exhaust and grease trap systems specifically for The Walk JBR F&B units.

Right-Sized Systems

We correctly size systems to your specific kitchen's cooking load, avoiding operational issues.

Complete Documentation

We prepare the full technical documentation authorities expect for kitchen exhaust and grease trap approval.

Get Your Kitchen Systems Approved

Structural Solutions designs and documents your kitchen exhaust and grease trap systems for The Walk JBR fit-out approval.

Kitchen Exhaust & Grease Trap — FAQs

How is exhaust system size determined?

Based on the type and quantity of cooking equipment, following recognised kitchen ventilation design standards.

Do all F&B units need a grease trap?

Generally yes — any kitchen producing fats, oils, or grease in wastewater needs an appropriately sized grease trap.

What happens if the exhaust system is undersized?

Poor fume clearance, potential health and safety issues, and possible authority rejection at inspection.

What do you need from me to get started?

Your plot or unit details, title deed or affection plan, any existing drawings and a short description of the works — we confirm the approvals needed and prepare the submission.

Can Structural Solutions size these systems for my specific kitchen?

Yes — we size exhaust and grease trap systems based on your actual kitchen equipment and cooking load.