
Structural Calculations for Curtain Walls in Dubai
Introduction
Dubai’s skyline is defined by its modern facades: sleek curtain walls, gleaming ACP panels, glass railings, and functional aluminum louvers. Behind every aesthetic design, however, lies a critical requirement—structural calculations that comply with local authority standards.
Whether you’re working on a villa extension in Jumeirah Park or a high-rise tower in Business Bay, Dubai Municipality (DM), Dubai Development Authority (DDA), Trakhees, and Nakheel mandate detailed structural reports for facade systems before granting approvals. This guide walks you through what’s needed and how Structural Solutions can help you get there quickly and efficiently.
Table of Contents
Why Structural Calculations Are Mandatory for Facade Elements
Façade elements may seem lightweight, but they are exposed to harsh wind pressures, seismic risks, and long-term durability challenges. In Dubai, these components must be checked structurally for:
- Wind load resistance (as per ASCE 7 or Dubai Code)
- Glass breakage prevention
- Support framing strength (steel/aluminum)
- Connection anchorage and pull-out resistance
- Deflection limits for occupant comfort and safety
Failing to submit compliant structural calculations can result in delays, redesigns, and rejection by consultants or authorities.
Elements That Require Structural Calculations
Here is a breakdown of the most common facade systems that require calculation before submission:
1. Continuous Curtain Walls (Typical Floor)
Curtain wall systems at typical floors require frame analysis for vertical and lateral loading. We check mullions and transoms for:
- Bending and shear resistance
- Deflection limits (L/175 max span)
- Wind load distribution across panels
2. Floor-to-Floor Curtain Wall with Sliding Doors
Sliding door inserts create load discontinuities. Our analysis considers:
- Frame rigidity at opening locations
- Wind load concentration
- Safe operation under lateral load
3. Aluminum Curtain Wall at Ground Floor
Ground-level walls must resist pedestrian impact and higher glass thickness. We check:
- Tempered vs laminated glass adequacy
- Fixing embedment into podium or slab
- Horizontal bracing needs
4. Aluminum Curtain Wall at Roof
These systems are subject to suction wind loads. We assess:
- Pull-out resistance at anchor points
- Reinforcement of upper tracks
- Water drainage and panel integrity
5. Steel Columns Covered by ACP
Cladding over structural steel needs:
- Thermal movement allowances
- Anchorage pull-out checks
- Impact resistance from ACP panels
6. Typical ACP Panel Layouts
ACP panels must meet fire and wind safety standards. Structural Solutions provides:
- Load testing simulations for adhesive/backing
- Rivet/screw spacing calculation
- Frame support detail validation
7. Glass Balustrade Systems
Glass railings are high-risk elements for fall protection. We verify:
- Post and glass thickness for 1.5 kN/m linear load
- Bolt embedment details into slabs
- Point load impact criteria (per BS 6180 / ASCE)
8. Glass Partition on Balcony
These partitions are subjected to exterior pressures. We ensure:
- Glass panel size limits
- Anchoring against suction uplift
- Compliance with barrier height codes
9. Louvers at Podium Level
Aluminum louvers at podiums often function as screens or sun shades. We analyze:
- Bracket support spacing
- Louver slat deflection
- Wind resistance
10. Louvers at Mechanical Floor
Mechanical floor louvers face higher turbulence and suction loads. Our calculations include:
- Structural frame behind louver grid
- Load path to slab or steel column
- Corrosion protection in support anchors

Dubai Authorities That Require Structural Calculations
Each authority in Dubai has slightly different documentation requirements:
Authority | Applicable Projects | Required Documents |
Dubai Municipality (DM) | Apartments, Villas | Calculation report, drawing markup, cover sheet |
DDA | Business Bay, Dubai Hills, DSO | Structural letter, report, PDF submission |
Trakhees | JAFZA, Palm Jumeirah, Nakheel | Compliance table, stamped report |
Nakheel | Freehold Villas, Palm, JVC | Hardcopy reports + digital soft copy |
EMAAR | Arabian Ranches, The Lakes | Consultant endorsement, approved drawing set |
What’s Included in a Structural Solutions Report
Our structural calculation reports are designed for fast approval and full compliance:
- ✅ Authority-compliant summary table
- ✅ Wind and live load assumptions per ASCE 7-22
- ✅ Glass stress and deflection check (per ASTM E1300)
- ✅ Aluminum section sizing with L/180 max deflection
- ✅ ACP panel support detailing
- ✅ Anchor bolt pull-out resistance
- ✅ Signed/stamped engineering cover sheet
We also coordinate with your designer or main consultant to match shop drawing references.
Why Choose Structural Solutions?
Unlike large firms that take weeks to respond, Structural Solutions provides a fast-track service tailored for facade components in Dubai. Our team includes freelance structural engineers with 10+ years of experience in curtain wall, ACP, and aluminum detailing.
We help contractors, interior designers, and façade companies:
- Submit compliant calculations to DDA, Trakhees, and DM
- Avoid delays due to missing fixings, frame checks, or anchor issues
- Translate architectural sketches into structural markups
- Reduce rejection risks by pre-validating assumptions
✅ Competitive fixed fees
✅ Fast delivery (3–5 working days)
✅ Signed calculation PDF & CAD markup support

Case Study: Curtain Wall & ACP Calculations in Business Bay
We recently supported a contractor on a mixed-use tower in Business Bay with:
- 5,000 sqm of curtain wall
- Sliding glass doors on every floor
- ACP panels over steel fins
Using SAP2000 and STAAD.Pro, we performed full analysis and delivered:
- 10 calculation packages
- Reviewed markups for DDA approval
- Resubmission response to consultant comments
Result: Approved in one cycle with zero technical rejections.
FAQs: Structural Calculations for Curtain Walls in Dubai
Q: Are aluminum louvers required to be checked structurally?
Yes. Especially on podium and mechanical floors due to wind suction and fixing failures.
Q: Can a contractor submit calculation reports directly to authorities?
Most authorities require the submission through a licensed consultant, but Structural Solutions can coordinate all needed documentation with your consultant.
Q: How long does it take to prepare reports?
Typically 3–5 working days depending on scope size and drawing clarity.
Q: Are STAAD or ETABS models included?
Yes, if required, we include model screenshots and governing load cases.
Get Your Calculation Report Started Today
If you’re installing curtain walls, ACP, glass balustrades, or louvers in Dubai, Structural Solutions is your expert freelance partner. We offer fast, fixed-fee structural calculation reports for all types of façade elements with complete compliance for DM, DDA, Trakhees, EMAAR, and Nakheel.
📞 Call us now at +971553394451
📧 Email: info@structuralsolutions.ae
🌐 Visit: www.structuralsolutions.ae
Let’s get your submittals approved the first time.