loader image
Shop Drawing Services in Dubai

Shop Drawing Services in Dubai – Fast, Accurate & Approval-Ready

Introduction: Why Shop Drawings Are Crucial in Dubai Projects

fast-paced construction and fit-out industry, Shop Drawing Services in Dubai are the backbone of accurate execution and authority compliance. Whether you’re building a steel canopy, installing MEP systems, or fabricating joinery items, the shop drawings translate design intent into buildable reality.

But preparing shop drawings takes more than CAD skills—it requires an understanding of engineering intent, material specifications, and local authority standards.

That’s where Structural Solutions steps in.

We offer freelance shop drawing services—precise, fast, and formatted for approval by consultants, clients, and Dubai’s major authorities like DM, DDA, and Trakhees.

What Are Shop Drawings?

Shop drawings are detailed construction-level documents that illustrate:

  • How elements will be fabricated or installed
  • The materials, dimensions, and specifications to be used
  • Integration with architectural, structural, and MEP systems
  • Installation methods and tolerances

Shop drawings are required for:

  • Steel structures (canopies, pergolas, trusses)
  • MEP installations (ducts, plumbing, electrical)
  • Joinery & carpentry works
  • Glass, façade, and aluminum systems
  • False ceilings, partitions, and interior fit-outs

Who Needs Shop Drawing Services in Dubai?

Client TypeShop Drawing Use Case
ContractorsFor submission to main consultant or authority
Fit-Out FirmsFor DDA, DM, or Trakhees approval packages
Steel & Aluminum FabricatorsFor canopy, shade, or façade fabrication drawings
Interior DesignersFor joinery and detailed carpentry execution
SubcontractorsTo avoid delays from incomplete IFC or tender drawings
Shop Drawing Services in Dubai

When Are Shop Drawings Required?

Shop drawings are typically required when:

  • The consultant requests detailed fabrication drawings
  • Authorities require pre-installation approvals (DM, Trakhees, DDA)
  • You’re fabricating non-standard items (custom steel, joinery, glass)
  • You need to coordinate between disciplines (e.g., MEP + structure)

What’s Included in Our Shop Drawing Services?

We prepare complete and approval-ready shop drawings based on IFC or concept inputs.

1. Steel & Aluminum Structures

  • Canopies, pergolas, car parking shades
  • Connection details, bolt arrangements
  • Member sizing and fabrication plans
  • Assembly drawings and erection sequencing

2. Electrical, HVAC & Plumbing

  • HVAC duct layouts with drop and riser details
  • Electrical conduit routing and DB board positioning
  • Drainage and water supply shop drawings
  • Coordination with architectural ceilings

3. Joinery & Interior Fit-Outs

  • Furniture, counters, cabinets, and custom joinery
  • Sectional details, material keys, and dimensions
  • Integration with lighting and AC cutouts

4. Glass & Façade Systems

  • Curtain wall panels
  • Cladding layouts
  • Glazing bead details
  • Fixing and anchoring details

5. Submittal Formats

  • DWG and PDF files
  • Elevations, plans, and sections
  • Proper title blocks with submission references
  • Revisions and clouded markups (if needed)

Why Use Structural Solutions for Shop Drawings?

We deliver fast, accurate, and approval-oriented shop drawings without the overhead of a full consultancy.

FeatureStructural Solutions
Freelance pricing✅ Affordable
UAE-based engineers and draftsmen✅ Yes
Consultant-approval coordination✅ Included
DM/DDA/Trakhees formats supported✅ Yes
Revisions included✅ Up to 2 rounds
CAD + PDF + BIM output (on request)✅ Yes

Real-World Project Example – Steel Car Parking Shade in Meydan

Scope: Prepare shop drawings for a steel-framed car parking shade in a villa community under Meydan approval
Challenges:

  • Limited information from IFC drawings
  • Urgent timeline: submission within 3 days
    Our Role:
  • Drafted detailed plans, elevations, and connection details
  • Included structural calculations (freelance)
  • Provided submission-ready PDF and CAD
  • Received approval from Meydan within 4 working days
Shop Drawing Services in Dubai

Shop Drawing Review Support for Consultants

We also help consultants who are overloaded with review tasks by:

  • Reviewing subcontractor shop drawings
  • Marking redlines and CAD corrections
  • Ensuring alignment with approved IFC and authority conditions

Typical Turnaround & Pricing

Scope TypeDelivery TimeStarting Fee (AED)
Single-item drawing1–2 working days600–1,200
Full structural set (shade, canopy, steel frame)2–4 days1,800–3,000
MEP / Joinery coordination3–5 days2,500–5,000+

Express service available (24–48 hours) for urgent cases.

FAQs – Shop Drawings in Dubai

💬 Do I need shop drawings if I already have IFC drawings?

✅ Yes. IFCs are for design intent; shop drawings show how it will be built or installed.

💬 Can you provide stamped drawings?

✅ For structural steel elements, yes—stamped by UAE-licensed engineers.

💬 Do you handle drawing revisions after consultant comments?

✅ Yes. We revise up to 2 rounds per scope—more if needed at additional cost.

💬 Can I use your drawings for authority submissions?

✅ Yes. We prepare DM/DDA/Trakhees-compliant drawings ready for upload.

Conclusion: Shop Drawings That Get Approved First Time

At Structural Solutions, we specialize in preparing shop drawings that reduce RFIs, avoid execution delays, and meet submission requirements from day one.

Whether you’re a contractor, interior fit-out firm, or steel fabricator—we deliver exactly what your consultant or authority expects.

Don’t let shop drawings delay your project. Send us your sketches, IFCs, or scope—and we’ll deliver within days.

📩 Ready to start your shop drawings? Get a quote today:
🌐 www.structuralsolutions.ae
📧 info@structuralsolutions.ae
📞 Call or WhatsApp: 055 339 4451

Structural Solutions – Dubai’s Trusted Freelance Engineers for Shop Drawings and Structural Drafting.

0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Most Voted
Newest Oldest
Inline Feedbacks
View all comments