5 Powerful Facts About Getting a Dubai Demolition Permit
By Eng Amjed / July 25, 2025
If you’re planning to demolish a villa, building, or even a wall in Dubai, understanding the Dubai demolition permit process is essential. Whether your property falls under Dubai Municipality (DM) or the Dubai Development Authority (DDA), the approval steps, documentation, and contractor requirements can vary. This guide breaks down the DM vs DDA demolition permit process, explains the roles of each authority, and answers your top questions. From property demolition NOC Dubai to demolition contractor approvals, we’ve got you covered with actionable insights and professional advice.
Table of Contents

1. Know Which Authority Covers Your Property
Before you apply for any permit, you must identify which authority governs your plot or building.
DM (Dubai Municipality)
- Covers most of old Dubai, suburban areas, and freehold villa communities.
- Examples: Al Quoz, Al Barsha, Deira, Mirdif, International City.
DDA (Dubai Development Authority)
- Governs Dubai Design District (D3), Dubai Internet City, Business Bay – Tecom zones, and certain mixed-use commercial areas.
- Works closely with master developers in private communities.
How to Check:
- Search your land title deed
- Visit the Dubai REST app
- Ask your master developer (e.g., EMAAR, Nakheel, Dubai Properties)
🔍 Tip: Contact Structural Solutions if you’re unsure — we’ll help you determine your correct authority instantly.
2. Documents Required for a Dubai Demolition Permit
Both DM and DDA have similar requirements, but each platform has its own portal and formats.
Common Required Documents:
- Copy of Title Deed or Oqood
- Affection Plan or Plot Plan
- Engineering Consultant Appointment Letter
- Demolition Contractor Appointment
- Structural Report (if partial demolition)
- Utility Disconnection NOCs (DEWA, Etisalat, Du)
- Approval from Master Developer (e.g., Nakheel, EMAAR, Dubai Properties)
DM Online Submission:
- Use the Dubai Building Permit System (DBPS)
- Engineer must be DM-licensed
- Turnaround: 7–10 working days (if all documents are correct)
DDA Online Submission:
- Submit through the DDA e-permit portal
- Requires DDA-registered Consultant and Contractor
- Turnaround: 10–14 working days (including site inspections)
3. Demolition Contractor Requirements in Dubai
Whether your property falls under DM or DDA, you cannot proceed without an approved contractor.
Contractor Requirements:
- Must be licensed for demolition activities
- Must have valid Dubai Civil Defence safety certification
- Must submit a demolition method statement and risk assessment
How to Find an Approved Contractor:
- Check the DM/DDA online contractor registry
- Contact Structural Solutions — we work with pre-approved contractors across both authorities.
4. Safety, Environmental, and Structural Considerations
Both DM and DDA place strict emphasis on public safety and structural integrity during demolition.
Safety & Environmental Rules:
- Submission of a Demolition Safety Plan
- Dust, noise, and debris control plans
- Adjacent property protection is mandatory
- Asbestos survey and disposal report (if applicable)
Structural Reports:
- Required when part of the building is to remain (e.g., partial villa demolition or wall removal)
- Must be stamped by a licensed structural engineer
🛠 Need a fast report? Structural Solutions can prepare a full structural assessment in 2–3 days.
5. Final Inspections and Permit Closure
The job doesn’t end when the building is gone — your authority needs to officially close the demolition permit.
DM Final Steps:
- Contractor uploads completion certificate
- Inspection scheduled by DM field engineers
- If all safety, debris, and utility standards are met — demolition permit closed.
DDA Final Steps:
- Submit final photographic report
- Submit as-built site plan post-demolition
- Site must be leveled and clear of debris
- DDA issues official closure certificate

DM vs DDA Demolition Permit – A Quick Comparison
Feature | Dubai Municipality (DM) | Dubai Development Authority (DDA) |
---|---|---|
Online Portal | DBPS | DDA ePermit |
Typical Areas Covered | Old Dubai, freehold villas | Tecom zones, D3, Media City |
Turnaround Time | 7–10 working days | 10–14 working days |
Contractor Must Be Approved? | Yes | Yes |
Structural Report Required? | For partial demo | For partial demo |
Safety Plan Requirement | Mandatory | Mandatory |
Frequently Asked Questions
Q1: Do I need a demolition permit to remove an internal wall in my villa?
A: Yes. Even for internal works, Dubai Municipality requires a structural report and minor work permit. If the wall is loading bearing, it must be verified by a licensed structural engineer.
Q2: How long does it take to get a demolition permit in Dubai?
A: Typically 7–10 working days for DM and 10–14 days for DDA, depending on completeness of documents and utility disconnections.
Q3: Can I apply for the demolition permit myself without a consultant?
A: No. Both DM and DDA require the application to be submitted through a registered consultant. Structural Solutions can assist whether you need a freelance engineer or full consultancy service.
Q4: Which is easier — DM or DDA demolition permit process?
A: DM is generally faster, but it depends on your location and developer. DDA is slightly stricter with documentation and inspections, especially in high-value commercial zones.
Q5: What happens if I demolish a property without a permit?
A: You risk a fine exceeding AED 50,000, possible construction ban, and legal action. Demolishing without a permit is a serious violation in both DM and DDA zones.
Final Call to Action
If you need expert assistance with civil engineering, structural design, or building permit approvals in Dubai, the team at Structural Solutions is ready to help. Contact us on WhatsApp or email us at: info@structuralsolutions.ae We’ll ensure your project meets all Dubai Municipality standards with precision and professionalism.