My Contractor Removed a Column Without Approval – What Should I Do Now?
In the fast-paced construction world of Dubai, structural modifications to villas, commercial spaces, or extensions are common. However, removing a structural column without proper approvals or structural assessment is a critical violation. This can jeopardize safety, violate municipal codes, and lead to serious legal and financial consequences.
If your contractor removed a column without prior engineering evaluation or municipal approval, it’s essential to act immediately. At Structural Solutions AE, we are structural engineering experts based in Dubai. We provide emergency structural assessments, retrofitting solutions, and compliance support to restore the integrity of your property. This article will guide you step-by-step through what to do if a column was removed without approval.
Table of Contents

Why Columns Are Crucial to Structural Stability
A column is a vertical structural member that transfers loads from beams, slabs, or roofs down to the foundation. Removing it without an engineered solution creates risks such as:
- Load path disruption
- Slab deflection or cracking
- Beam failure
- Foundation instability
- Collapse in extreme cases
In engineered structures, every column is calculated to carry a specific share of the building’s weight. Its removal, even temporarily, compromises the structure’s equilibrium, safety, and compliance.
Common Reasons Columns Are Removed Without Approval
Many villa owners and contractors undertake renovation or extension works, assuming a column is non-load bearing. Mistakes often arise due to:
- Lack of structural drawings or analysis
- Misinterpretation of architectural layouts
- Urgency in completing works
- Cost-saving shortcuts
- Inexperienced or unlicensed contractors
Unfortunately, the consequences far outweigh the perceived convenience. In Dubai, any structural modification must be approved by Dubai Municipality, Trakhees, or the respective developer (Nakheel, EMAAR, etc.).

Immediate Actions to Take After Unauthorized Column Removal
✅ Step 1: Stop Construction Immediately
Cease all renovation or construction work. Continuing can cause further structural stress and increase legal complications.
✅ Step 2: Inform Your Developer or Municipality
If the structure is in a master community like Palm Jumeirah (Nakheel), Dubai Hills (EMAAR), or Jumeirah Village Circle, notify the developer’s inspection team. Dubai Municipality or Trakhees may also issue a violation if unreported.
✅ Step 3: Engage a Licensed Structural Engineer
Contact a certified structural engineer (like Structural Solutions AE) to:
- Inspect the site
- Perform load redistribution calculations
- Assess cracks, deflections, and signs of distress
- Suggest immediate temporary support
✅ Step 4: Implement Emergency Shoring (if needed)
If the column was load-bearing, temporary steel props or frames may be needed to stabilize the structure. This must be done under expert supervision.

How Structural Solutions Can Help
We specialize in emergency structural assessments and regularization approvals. Here’s how we support you:
- 🛠️ On-Site Structural Assessment
Inspect damage, movement, and risks. Analyze load redistribution. Suggest short-term stabilization measures. - 📐 Structural Recalculation & Retrofitting Design
Evaluate the original load path and structural model. Redesign alternate supports: hidden beams, steel columns, cantilevers. Propose strengthening solutions (FRP wrapping, jacketing, etc.). - 📄 Prepare Approval Documents
Prepare structural analysis report (ETABS, STAAD.Pro, hand calculations), engineering drawings (CAD), and compliance letters for authorities (Dubai Municipality, DDA, Trakhees). - 📝 Regularize Works with Authorities
Assist with Dubai Municipality regularization procedures. Submit structural justification to Nakheel, EMAAR, or Trakhees. Handle violation notices and technical clarifications.
Dubai Regulations for Structural Modifications
✅ Dubai Municipality (DM)
For any structural change, especially involving columns, slabs, or beams:
- Engineering consultancy drawings must be submitted
- Structural justification report required
- Site inspection by DM or third-party authority
✅ Trakhees / DDA / Nakheel
In freehold and master developer zones:
- You must submit NOCs for all structural modifications
- Unauthorized works result in stop work orders, penalties, or rectification notices
- Retrofitting proposals must be stamped by a licensed engineer
Can the Column Be Replaced or Eliminated Permanently?
Yes—but only after careful structural analysis. Possible engineered alternatives include:
- Hidden steel beams in ceiling slabs to redistribute loads
- Concrete transfer beams or frames
- Jacketing or strengthening adjacent columns
- Using new columns in alternate load paths
We evaluate if the load can be safely redirected and design permanent solutions that meet Dubai’s structural safety codes.
Consequences of Inaction
Ignoring unauthorized column removal or delaying rectification can lead to:
- Structural collapse
- Insurance nullification
- Developer fines and blacklisting
- Government violations and demolition orders
- Severe safety hazards to occupants
Dubai authorities take structural safety seriously. It’s always better to act proactively and regularize the structure legally.
Real Case Study: Emergency Column Reinstatement in Dubai
Case: A contractor in Jumeirah Park removed a central column during a kitchen extension.
Problem:
- The slab above showed minor cracks
- Work stopped by Nakheel inspector
- No structural design was available
Solution by Structural Solutions:
- Conducted site inspection within 24 hours
- Designed steel beam and steel jacketing system
- Submitted revised calculations and drawings
- NOC obtained from Nakheel within 7 days
Outcome: The structure was approved, strengthened, and reoccupied safely with no penalties.
How to Prevent This Situation in Future
✅ Always Hire a Licensed Contractor
Ensure they coordinate with certified structural engineers and apply for required permits.
✅ Request Structural Review for Renovations
Even for non-load-bearing walls, consult engineers to verify structural impact.
✅ Include Approval Costs in Your Budget
Structural NOCs are essential—and legal—requirements, not optional expenses.
Contact Structural Solutions for Help
If your contractor has removed a column without approval—or you’re unsure if a column is load-bearing—don’t wait. Contact us now.
At Structural Solutions, we provide:
- Emergency site assessments
- Structural retrofitting designs
- Approval documentation for DM, Nakheel, Trakhees
- Freelance, cost-effective engineering support
📞 Visit us at www.structuralsolutions.ae
📧 Email: info@structuralsolutions.ae
📍 Serving all of Dubai and surrounding emirates
Let us restore your villa’s safety—and get your project back on track.