Emaar villa extension fees, explained.

How Emaar charges for a villa or townhouse extension, what affects the amount, and how to apply without surprises. Our engineers measure the added area, prepare the drawings and handle the Emaar NOC and the authority permit.

How do Emaar extension fees work?

Emaar charges for an extension through the NOC application: an application fee plus a charge based on the added gross floor area (GFA). Villas pay AED 1,000 per sq ft of added GFA up to 10%, and AED 3,000 to AED 6,000 per sq ft above 10%, subject to Emaar Management approval. Townhouses pay AED 1,000 per sq ft. Villas can extend beyond 10% of the GFA at AED 3,000 to AED 6,000 per sq ft, subject to Emaar Management approval. Emaar confirms the amount during the NOC application.

Charged onThe added gross floor area (GFA)
RateFrom AED 1,000 per sq ft
ConfirmedBy Emaar during the NOC application

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The Dubai Municipality or DDA permit fee is separate.

What makes up the Emaar extension fee?

  • Application fee: Paid when the NOC application is submitted.
  • GFA charge: Based on how much floor area the extension adds.
  • Rate per sq ft: AED 1,000 per sq ft of added GFA for villas up to 10% and for townhouses.
  • Beyond 10% (villas): Villas can extend beyond 10% of the GFA at AED 3,000 to AED 6,000 per sq ft, subject to Emaar Management approval.
  • Authority permit: After the Emaar NOC, Dubai Municipality or DDA issues the building permit, depending on the community.

Documents for the application

  • Title deed and owner ID
  • Existing drawings or as-built drawings
  • Proposed drawings showing the added floor area
  • Stamped structural calculations
  • Photos of the villa

By community

Emaar communities and their approval route

The Emaar NOC comes first everywhere. The building permit depends on the community.

CommunityApproval routeGuides
Arabian Ranches 1, 2 and 3
Emaar · DDA
Emaar NOC, then the DDA permit.Arabian Ranches
Dubai Hills Estate
Emaar · DDA
Emaar NOC, then the DDA permit.Dubai Hills
The Springs, The Meadows, The Lakes
Emaar · Dubai Municipality
Emaar NOC, then the Dubai Municipality permit.The Springs
The Meadows
Emirates Hills
Emaar · Dubai Municipality
Emaar NOC, then the Dubai Municipality permit.Emirates Hills

How it works

From idea to approved extension

Measure your villa

We confirm the existing GFA from your drawings and how much the extension adds.

Drawings and calculations

Our engineers prepare the drawings and stamped structural calculations.

Emaar NOC application

Submitted, with the application fee.

Emaar review

Emaar reviews the design and confirms the GFA charge.

Authority permit

Dubai Municipality or DDA, depending on the community.

Inspection and completion

Final inspections and the completion certificate.

Villa or townhouse

What changes the amount

🏡

Villas

AED 1,000 per sq ft up to 10%; AED 3,000 to AED 6,000 per sq ft above 10%, subject to Emaar Management approval.

Emaar villa extension NOC →
🏘️

Townhouses

Townhouses pay AED 1,000 per sq ft, with no higher bands.

Emaar approvals →
📐

What counts as GFA

New rooms, enclosed areas and mezzanine floors add GFA. We measure it from the drawings, so the application is accurate.

Does a mezzanine count as GFA? →

What can raise the cost

  • Adding more floor area than planned
  • Going beyond 10% of the GFA on a villa
  • Unapproved works that must be regularised first
  • Rejected drawings and resubmissions
  • Starting works before the NOC

Questions

Emaar extension fees FAQs

How do Emaar extension fees work?

Emaar charges an application fee plus a charge based on the added gross floor area (GFA), at AED 1,000 per sq ft up to 10% for villas and for townhouses, with higher villa rates above 10% subject to Emaar Management approval. Emaar confirms the amount during the NOC application.

Are the fees the same for villas and townhouses?

No. Each community's guidelines set separate rates for villas and townhouses.

Can I extend my villa by more than 10% of the GFA?

Yes, villas can extend beyond 10% of the GFA at AED 3,000 to AED 6,000 per sq ft, subject to Emaar Management approval.

When do I find out the exact amount?

Emaar confirms it during the NOC application, based on the added GFA in your drawings.

What does Structural Solutions do?

We measure the existing and added GFA, prepare the drawings and stamped calculations, apply for the Emaar NOC and the authority permit, and handle inspection and completion.