Nakheel villa extension fees, explained.

How Nakheel charges for a villa extension, what the AGFA charge is, and how to apply without surprises. Our engineers measure the added area, prepare the drawings and handle the Nakheel NOC and the Trakhees permit.

How do Nakheel extension fees work?

Nakheel charges for a villa extension based on the additional gross floor area (AGFA) the extension adds. In Al Furjan the current rate is about AED 1,400 per sq ft; in other communities Nakheel's team reviews the application and sends the final invoice. The Nakheel NOC fee is AED 5,250, or AED 15,750 with a pool, and Trakhees issues the building permit afterwards.

Charged onThe additional GFA (AGFA)
PriceNo fixed price
Final amountInvoiced by the Nakheel team

What is the Nakheel AGFA charge?

  • AGFA: The additional gross floor area your extension adds to the villa.
  • Rate: about AED 1,400 per sq ft in Al Furjan (current); in other communities Nakheel calculates the charge for each application.
  • Final invoice: Nakheel's team sends the final invoice after reviewing the application.
  • Authority permit: After the Nakheel NOC, Trakhees issues the building permit.

Documents for the application

  • Title deed and owner ID
  • Existing drawings or as-built drawings
  • Proposed drawings showing the added floor area
  • Stamped structural calculations
  • Photos of the villa

By community

Nakheel communities and their approval route

The Nakheel NOC comes first, then the Trakhees permit.

CommunityApproval routeGuides
Palm Jumeirah
Nakheel · Trakhees
Nakheel NOC, then the Trakhees permit.Palm Jumeirah
Jumeirah Park
Nakheel · Trakhees
Nakheel NOC, then the Trakhees permit.Jumeirah Park
Jumeirah Islands
Nakheel · Trakhees
Nakheel NOC, then the Trakhees permit.Jumeirah Islands
Al Furjan
Nakheel · Trakhees
Nakheel NOC, then the Trakhees permit.Al Furjan
Jumeirah Village Circle
Nakheel · Trakhees
Nakheel NOC, then the Trakhees permit.JVC

How it works

From idea to approved extension

Measure your villa

We confirm the existing GFA and how much the extension adds.

Drawings and calculations

Our engineers prepare the drawings and stamped structural calculations.

Nakheel NOC application

Submitted.

Nakheel review and invoice

Nakheel's team reviews the design and sends the final invoice for the AGFA charge.

Trakhees permit

We submit to Trakhees as approved consultant.

Inspection and completion

Final inspections and the completion certificate.

Before you apply

What changes the amount

📐

The added floor area

The more floor area the extension adds, the higher the AGFA charge. We measure it from the drawings.

Does a mezzanine count as GFA? →
🧾

Nakheel's review

About AED 1,400 per sq ft in Al Furjan. Elsewhere Nakheel calculates the charge for each application and invoices it.

Nakheel villa extension NOC →
🔍

Existing works

Unapproved works found in the villa may need to be regularised before the extension.

Nakheel approvals →

What can raise the cost

  • Adding more floor area than planned
  • Unapproved works that must be regularised first
  • Rejected drawings and resubmissions
  • Starting works before the NOC

Official fees

Nakheel NOC fees, Trakhees deposit and fines

ItemAmountNote
Nakheel NOC feeAED 5,250Villa works without a swimming pool
Nakheel NOC fee with a swimming poolAED 15,750When the works include a pool
Nakheel security depositNoneNakheel takes no deposit
Added area in Al FurjanAbout AED 1,400 per sq ftCurrent rate; other communities, Nakheel confirms the rate
Trakhees building permitAbout AED 1,500 to 3,000For structural works, extensions and pools
Trakhees security depositAED 2,500Refundable after the works are completed and cleared
Fine for works without approvalAED 2,000 to 10,000Up to AED 50,000 in some cases

Official fees as of November 2026. Nakheel and Trakhees set these and can change them. Our engineering fee is separate and quoted after we review your villa. Full Nakheel NOC guide

Questions

Nakheel extension fees FAQs

How do Nakheel extension fees work?

Nakheel charges based on the additional gross floor area (AGFA) the extension adds. In Al Furjan the current rate is about AED 1,400 per sq ft; in other communities Nakheel's team reviews the application and sends the final invoice.

Is there a Nakheel price list for extensions?

Nakheel does not publish one. In Al Furjan the current rate is about AED 1,400 per sq ft; in other communities the charge is calculated by Nakheel for each application.

When do I receive the final amount?

Nakheel's team sends the final invoice after reviewing the NOC application.

Do I still need a Trakhees permit?

Yes. After the Nakheel NOC, Trakhees issues the building permit.

What does Structural Solutions do?

We measure the existing and added floor area, prepare the drawings and stamped calculations, apply for the Nakheel NOC and the Trakhees permit, and handle inspection and completion.