DDA villa extension fees, explained.

How the charges for a villa extension work in DDA communities such as Arabian Ranches, Dubai Hills, DAMAC Hills and Tilal Al Ghaf, and how to apply without surprises.

How do villa extension fees work in DDA communities?

In DDA communities, an extension needs the master developer's NOC first and then the DDA building permit. The developer's charge depends on the developer and the community; Emaar, for example, charges on the added gross floor area (GFA). The amounts depend on the community, the developer and the scope, and they are confirmed during each application.

Step 1Developer NOC and the developer's charge
Step 2DDA building permit
AmountsConfirmed during each application

What do you pay for?

  • Developer NOC: The master developer approves the extension. Emaar charges on the added GFA under each community's guidelines.
  • DDA permit: DDA issues the building permit, submitted by an approved consultant.
  • Completion: Inspection and the completion certificate close the permit.

Documents for the application

  • Title deed and owner ID
  • Existing drawings or as-built drawings
  • Proposed drawings showing the added floor area
  • Stamped structural calculations
  • Photos of the villa

By community

DDA communities and who issues the NOC

The developer NOC comes first, then the DDA permit.

CommunityApproval routeGuides
Arabian Ranches and Dubai Hills
Emaar · DDA
Emaar NOC through the Emaar Community Portal, with a charge on the added GFA, then the DDA permit.Emaar extension fees
DAMAC Hills and DAMAC Hills 2
DAMAC · DDA
DAMAC NOC by email, then the DDA permit.DAMAC Hills
Tilal Al Ghaf
Majid Al Futtaim · DDA
MAF NOC through the MAF app, then the DDA permit.Tilal Al Ghaf
Town Square
Master developer · DDA
Developer NOC by app or email, then the DDA permit.—

How it works

From idea to approved extension

Measure your villa

We confirm the existing area and how much the extension adds.

Drawings and calculations

Our engineers prepare the drawings and stamped structural calculations.

Developer NOC

We apply to the master developer for your community.

DDA permit

We submit to DDA as approved consultant.

Inspection and completion

Final inspections and the completion certificate.

What can raise the cost

  • Adding more floor area than planned
  • Unapproved works that must be regularised first
  • Rejected drawings and resubmissions
  • Starting works before the NOC and permit

Questions

DDA extension fees FAQs

How do villa extension fees work in DDA communities?

You need the master developer's NOC first and then the DDA building permit. The developer's charge depends on the developer and the community, and the amounts are confirmed during each application.

Does DDA charge on the added floor area?

The charge on the added floor area comes from the developer, for example Emaar in Arabian Ranches and Dubai Hills, under each community's guidelines.

Who submits to DDA?

An approved consultant. Owners cannot submit directly.

Which communities are under DDA?

Arabian Ranches, Dubai Hills, DAMAC Hills, Tilal Al Ghaf, Town Square, Mudon and many more.

What does Structural Solutions do?

We measure the added area, prepare the drawings and stamped calculations, apply for the developer NOC and the DDA permit, and handle inspection and completion.